Charles 360-80 Test Procedure Download Page 6

Section 360-080-102

6

Step

System Response

Action

4.

For a full-size FXS,

 

connect a test cable from a

telephone to one of the TIP/RING pairs on the rear

connector.
For a half-size FXS,

 

connect the test cable from a

telephone to the front connector.

5.

Place the telephone off-hook and verify that the

appropriate chassis slot LED lights only when the

telephone is off-hook.

6.

Connect the T1 with the appropriate time slot to a

T1 signaling test set or another D4 channel bank

configured with an FXO at the far end which is

then connected to a telephone (CO) switch or tele-

phone line simulator.

Verify that a telephone call can be made through

the FXS to the telephone switch or test set.
Verify that a telephone call can be made from the

telephone switch or  test set to the FXS.

6.2

FXO Card Acceptance Test

Step

Action

System Response

1.

Make sure that the ICB is turned up and operating.

2.

Install the FXO card per its documentation.

All LEDs should light, flash and then turn off.
If the T1 is not in sync, the LEDs may light again.

3.

Log in to the NMS or craft interface and verify that

the FXO card is recognized in the proper chassis

slot and the first-time boot-up configuration is

FXO/LS.

4.

For a full-size FXO,

 

connect a test cable from a

telephone (CO) switch or telephone line simulator

to one of the TIP/RING pairs on the rear connec-

tor.
For a half-size FXO, connect the test cable from a

telephone switch or telephone line simulator to the

front connector.

5.

Connect the T1 with the appropriate time slot to a

T1 signalling test set or another D4 channel bank

configured with an FXS and telephone at the far

end.

Verify that a telephone call can be made from the

switch through the FXO to the FXS.
Verify that a telephone call can be made from the

FXS through the FXO to the Telephone switch.

6.3

E&M Card Acceptance Test

Step

Action

System Response

1.

Make sure that the ICB is turned-up and operating.

2.

Install the E&M card per its documentation.

All LEDs should light, flash and then turn off.
If the T1 is not in sync, the LEDs may light again.

3.

Log in to the NMS or craft interface and verify the

chassis/card configuration.

Verify the E&M card is recognized in the proper

chassis slot and the first time boot up initialization

configuration is E&M mode V.

4.

Enable the tone test function under for the channel

to be tested.
If using NMS, select Loopback of the E&M Card.
If using the craft interface, select Tone Test.

Tone test success.

5.

E&M card acceptance test is complete.

Summary of Contents for 360-80

Page 1: ...echnical specifications herein subject to change without notice Page 1 of 9 360 80 Intelligent Channel Bank Turn Up and Acceptance Test Procedure CONTENTS PAGE Part 1 GENERAL 2 Part 2 VERIFYING ELECTR...

Page 2: ...the Shelf documentation for the proper procedure Figure 1 displays the shelf rear panel 2 Apply power to the shelf 3 Locate the power terminal block on the rear see Figure 1 of the ICB Using a voltmet...

Page 3: ...ID PWR Figure 2 T1 Controller Unit Front Panel 4 CONTROL VERIFICATION To get the information displayed as shown the control verification tests should be done with alarms active Control verification is...

Page 4: ...th the NMS software installed con nect the ethernet from the PC to the network con trol terminal J2 on the rear of the T1 S 3 Activate the NMS software on the PC The NMS may start with the window mini...

Page 5: ...rms exist 2 Release the T1 loopback Verify that there are visual and audible alarms 3 View the alarm status on the craft terminal and or NMS Display should show the correct alarm status 4 Press the AC...

Page 6: ...nd the first time boot up configuration is FXO LS 4 For a full size FXO connect a test cable from a telephone CO switch or telephone line simulator to one of the TIP RING pairs on the rear connec tor...

Page 7: ...st Step Action System Response 1 Make sure that the ICB is turned up and operating 2 Insert the DSU card into the appropriate slot of the ICB 3 Enable the NMS or craft interface and verify the chassis...

Page 8: ...loopback menu listed under T1 settings for VT100 craft ter minal perform an OCU near end latching loop back with 2047 test pattern enabled Display should show Map 1 with zero bit errors Loopback LED t...

Page 9: ...enter admin 11 Enter the following ip ping 192 168 0 1 Verify that the ping is returned 8 TECHNICAL ASSISTANCE If technical assistance is required contact Charles Industries Technical Services Center...

Reviews: