Assemble the 8 studs 12 x 65 around the rear section’s start and return orifices.
• If necessary, insert the distributor (see figure 22) in the return orifice by interpolating the seal
(13).
• Place the boiler in its final position and level it, which would be made easier by the "Adjustable
legs" option (chapter 3 . 1)
• Screw the pocket and the reducer (7) in a leaktight manner in the front section’s upper orifice.
• A threaded orifice Ø 2" is provided at the bottom of the front section, for mounting a valve
enabling rinsing and flushing of the installation’s sludge (we recommend mounting coil, a 90°
bend and the valve). A pre-cut space allows for passing the tubing in the casing’s lower
panel.
• Mount a drain valve tightly (not provided) on the installation or in the lower part of the rear
section using a reducer (not provided).
• A drain valve Ø 3/4" is delivered with the "Connection sleeves" option (see chapter4 . 2).
• Connect the flanges on the installation’s tubing, than fasten them on the boiler, interpolating
the seal (13), with 4 HM 12 nuts and 4 washers for each.
• After having checked the connections, proceed slowly with filling the installation, ensuring all
the air is vented, then proceed to the hydraulic test ((1.3 x P. operation) to check all leaktight
areas.
• Screw the shortest threaded part of the 4 studs M 8 x 40 in the rear section in the upper part.
• Check that the leaktightness braid (21) is in place.
• Engage the smoke box on the studs and fasten it (4 HM nuts and 4 washers) by tightening
the nuts moderately and simultaneously.
• Connect the boiler to the stack in the most direct possible manner and without reduction of
the size of the smoke duct. Ensure that the latter is leaktight.
• Insert the assembled baffles (18) in the upper "flue-ways" and, if need be, the simple baffles
(18a) in the lower "flue-ways" (see chapter 4 . 3).
• Screw the small threaded part of the 8 studs M 8 x 40 in the front section following the
indications of figure 10.
• Define the opening side for the doors.
• Mount the hinges (1 screw HM 10 x 30 + 1 nut HM 10 + 2 washers L 10 for each guide). The
door guide is located opposite the hinges, in the upper part.
• Depending on the chosen opening side, secure the hinge (9a) on each door using 2 screws
HM 12 x 35 + 2 washers M 12.
Caution:
For reasons of practicality, it is recommended to mount the firebox door first.
• Mount the doors on the hinges using the axes (11).
• Engage the doors on the studs and fasten them (4 nuts HM 10 and 4 washers L 10 for each
door), tightening the nuts lightly and simultaneously.
• Depending on the size of its fixation, the burner is mounted directly on the door, or via a
perforated plate (see figure 11). Mount the burner plate (4 screws HM 12 x 35 + 2 washers
M 12) on the chamber door, interpolating the leaktightness seal (29).
- A plain plate may be provided on request.
3 . 4 Operational assembly diagram
Operation
Open the "chamber accessories" parcel
Distributor (14 - 14a)
Installing the boiler
Sensor pocket (8)
Sludge flushing
Drain valve (16)
Welding- flange (12)
Filling and hydraulic test
Smoke box (19 - 19a)
Stack
Optimizing baffles (18 and 18a)
Door hinges (9)
Door guide (10)
Door hinge (9a)
Chamber (22) and
Cleaning door (30)
Burner plate (28)
Summary of Contents for NXR3
Page 19: ...19 Ref CH 1249 A 2 ...