20018247
10
GB
Installation
Key to lay-out
C
– Capacitor
E
– Ignition electrode
F
– Photoresistance
MV
– Fan motor
R
– Heater 55W
S3
– Remote lock-out signal (230V - 0.5A max.)
TA
– Start termostat
TB
– Burner-earth
TL
– Limit thermostat
TS
– Safety thermostat
T6A
– Fuse
V1
– Oil valve
X7
– 7 pin plug
XP7
– 7 pole socket
TESTING
Check the shut-down of the burner by opening the thermostats
and the lock-out by darkening the photoresistance.
L
N
T6A
TL
S3
X7
XP7
TB
E
F
V1
TS
C
MV
Fig. 17
D9925
TIGRA 2 CF 710
CONTROL BOX
535SE/LD
~ 50Hz - 230V
Black
Blue
White
TO BE DONE BY
THE INSTALLER
CARRIED-OUT
IN FACTORY
L
N
TS
TL
S3
X7
XP7
TB
E
F
V1
R
MV
C
TA
T6A
Fig. 18
D9838
TIGRA 2 CF 510 R - TIGRA 2 CF 710 R
CONTROL BOX
535RSE/LD
~ 50Hz - 230V
Black
Blue
White
CARRIED-OUT
IN FACTORY
TO BE DONE BY
THE INSTALLER