P600NT2B
P600NT1A
P600NT2EA
When securing metal parts, apply a
small amount of thread lock.
Secure the MR148 bearing in place with a small amount of CA glue.
Avoid allowing any glue to contaminate the bearing. This may cause
poor results or total binding of the bearing.
When inserting the Torque Tube into the tail boom, apply a film of oil
and use the provided PVC packing tube to secure the bearing holder of
the torque tube into the tail boom while maintaining a square position
relative to the tail boom.
Tips for assembling the Torque Tube
When assembling the torque tube into the tail boom
section, apply a light film of oil to the torque tube to
allow for smooth assembly. Once assembled check
for smooth rotation and adjust as needed.
Summary of Contents for Nitro Pro 600
Page 4: ......
Page 11: ...P600NB1C P600NB1A P600NB4B When securing metal parts apply a small amount of thread lock...
Page 13: ...P600NB4A P600NB1B P600NB1C When securing metal parts apply a small amount of thread lock...
Page 14: ...P600NB1B When securing metal parts apply a small amount of thread lock...
Page 15: ...P600NZ4...
Page 16: ...P600NZ2A P600NZ2 P600NZ4 P600NT3B...
Page 22: ......
Page 23: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......