Champion Power Equipment Paralink 100740 Operator'S Manual Download Page 9

100740 - PARALLEL KiT

ASSEMbLY AND OPERATiON

9

ASSEMbLY AND OPERATiON

This parallel kit is intended for use with Champion Power 
Equipment inverters rated between 2000 and 3000 starting 
watts. Please refer to your inverter Operator’s Manuals for safety 
rules, start up and shut down procedures, specifications, and 
troubleshooting.

The total output of this kit will depend on the rated wattage of the 
inverters connected to it. The maximum output of the parallel kit is 
the amperage rating of the circuit breakers.

Paralleling Two inverters

 

WARNiNG

If not spaced apart, the exhaust heat from one unit may 
discolor or melt the plastic on the other unit. Always read your 
inverter Operator’s Manuals before operating the inverters and 
parallel kit.

1.  Ensure both inverters are turned off and all electrical loads 

are disconnected before installing parallel kit.

2.  Align the inverters in a “V” configuration so the exhausts of 

each inverter are pointed well away from each other and the 
inverters are a minimum of 18 in. (46 cm) apart.

18 in. (46 cm)

3.  Mount the parallel kit to the inverter on the right of the “V” so 

that it rests on the side without the fuel cap.

4.  Place the bracket around the handle and tighten the fastening 

dial by turning clockwise until snug. Do not over tighten. You 
may need to loosen the fastening dial to get it around the 
handle before tightening.

5.  On each inverter, lift the parallel port covers, if applicable, 

and insert the RED power lead into the RED receptacle and 
the BLACK power lead into the BLACK receptacle.

6.  On each inverter, connect the grounding wire to the grounding 

terminal on the inverter and secure the grounding lugs.

7.  Start engine of both inverters according to inverter Operator’s 

Manuals. Observe the green output indicator light on both 
inverter panels. The light may blink during start up and will 
turn solid green when loads may be connected.

8.  Connect devices to the parallel kit and/or inverters up to the 

receptacles rated amperage. It is best to connect devices 
with the largest load first. Allow the engine to stabilize 
before plugging in more devices. Never exceed the specified 
capacity of the receptacle.

9.  Follow the instructions in the inverter Operator’s Manuals 

when turning off the inverters.

 

NOTiCE

If the parallel kit has been overloaded and the circuit breaker 
has been tripped, reduce the load and press the parallel kit 
reset button to restore power.

 

NOTiCE

This parallel kit is meant to parallel two ParaLINK compatible 
inverters together. Both inverters must have ParaLINK parallel 
receptacles as shown below:

Summary of Contents for Paralink 100740

Page 1: ...precautions which should be read and understood before operating the product Failure to do so could result in serious injury This manual should remain with the product Specifications descriptions and...

Page 2: ...all carbon monoxide risks you ll be better prepared to protect your family from this colorless oderless threat CARBON MONOXIDE SAFETY THE BIG PICTURE KNOW THE SYMPTOMS Headache Nausea Shortness of br...

Page 3: ...uction 4 Safety Definitions 4 Important Safety Instructions 5 Safety Symbols 7 Controls and Features 8 Control Panel 8 Assembly and Operation 9 Paralleling Two Inverters 9 Adjusting the Anti Vibration...

Page 4: ...s been made to ensure the accuracy and completeness of the information in this manual at the time of publication and we reserve the right to change alter and or improve the product and this document a...

Page 5: ...can entangle hands feet hair clothing and or accessories Traumatic amputation or severe laceration can result Keep hands and feet away from rotating parts Tie up long hair and remove jewelry DO NOT w...

Page 6: ...cm of clearance on all sides to ensure adequate cooling Maintain at least 5 ft 1 5 m of clearance from combustible materials WARNING Rapid retraction of the recoil cord will pull hand and arm towards...

Page 7: ...ock Improper connections to a building can allow current to backfeed into utility lines creating an electrocution hazard A transfer switch must be used when connecting to a building Fire Explosion Fue...

Page 8: ...Indicator Illuminates green when power is being supplied to the parallel kit 2 Circuit Breakers Push Reset Protects the generator against electrical overloads RECEPTACLES A t 120V AC 30A RV NEMA TT 3...

Page 9: ...andle and tighten the fastening dial by turning clockwise until snug Do not over tighten You may need to loosen the fastening dial to get it around the handle before tightening 5 On each inverter lift...

Page 10: ...m of the parallel kit that can be removed or moved to create a friction fit wedge between the parallel kit and inverter If after tightening the fastener dial your parallel kit is vibrating during oper...

Page 11: ...40 Parallel Kit Specifications 11 SPECIFICATIONS Specifications Model 100740 Volts AC 120 Frequency 60 Hz Phase Single Weight 3 1 lb 1 39 kg Length 8 6 in 21 8 cm Width 6 4 in 16 2 cm Height 5 in 12 8...

Page 12: ...part or the equipment as a whole Installation Use and Maintenance This warranty will not apply to parts and or labor if the product is deemed to have been misused neglected involved in an accident abu...

Reviews: