100868 - LOAD MANAgEMENT MODULE
TEACHINg SYSTEM
12
NO
1 2 3 4 5 6 7 8 9 10 11 12
0 1
2
3
4
5
6
7
8
9
0 1
2
3
4
5
6
7
8
9
TEACHINg SYSTEM
After installation and wiring are complete teach
the ATS which loads are attached by the following
procedure.
1. Turn Champion aXis™ ATS UTILITY circuit
breaker to the OFF position. Generator will
start and run automatically.
2. Confirm managed loads are all operating.
3. Press and hold the button marked “LEARN”
for 8 seconds. ATS will shutoff managed
loads one at a time until all are OFF. ATS will
flash LED’s indicating function in process. A
green flashing light indicates learning was
successful. A red flashing light indicates an
overload has occurred.
4. After ATS has learned all loads the LMM units
will be returned to normal operation.
5. Installation configuration is now held in
memory and will not be affected by power
outage.
6. Return UTILITY circuit breaker to the ON
position. ATS will transfer load back to utility
and generator will cool down and shut off.
7. Repeat this process if LMM units are added or
removed from the system.
NO
1 2 3 4 5 6 7 8 9 10 11 12
0 1
2
3
4
5
6
7
8
9
0 1
2
3
4
5
6
7
8
9
MAINTENANCE
The LMM is designed to be maintenance free
under normal use. However, inspection and
maintenance checks should be made on a regular
basis. Maintenance will consist mainly of keeping
the module clean. Visual inspection should be
done at least once a month. Access to the module
must not be obstructed, follow NEC or local code
requirements for clearance around a distribution
box. Check for an accumulation of dirt, moisture
and/ or corrosion on and around the enclosure,
loose parts/hardware cracks and/or discoloration to
insulation, and damaged or discolored components.
Exercise the module as part of the transfer switch
test at least once every three months Functional
Testing unless a power outage occurs, and the home
generator has gone through an automatic sequence.