Fasten the Beam to the Beam Upright. With 3—2¼” screws per side (6 total).
Fasten Part #22 with 3—2¼” screws as pictured.
Toenail this screw through Part #22 into Part #19.
Predrill with a 5/32” drill bit before fastening.
Repeat on the opposite side.
Step #36
Total Hardware:
14 - 2¼”screws