Connect the ethernet cable to the LiftMaster Internet Gateway™ and the
router.
Connect power to the LiftMaster Internet Gateway™.
Create an online account by visiting www.myliftmaster.com.
Register the LiftMaster Internet Gateway™.
Use an internet enabled computer or smartphone to add devices. The
LiftMaster Internet Gateway™ will stay in learn mode for three minutes.
Ensure gate is closed.
Give the operator an OPEN command.
Within 30 seconds, when the gate is at the open limit toggle the reset
switch 3 times (on primary gate) to put primary operator into High Band
Learn Mode (the operator will beep as it enters learn mode). The
LiftMaster Internet Gateway™ will pair to the operator if it is within
range and the operator will beep if programming is successful.
Connect the ethernet cable to the LiftMaster Internet Gateway™ and the
router.
Connect power to the LiftMaster Internet Gateway™.
Create an online account by visiting www.myliftmaster.com.
Register the LiftMaster Internet Gateway™.
Use an internet enabled computer or smartphone to add devices. The
LiftMaster Internet Gateway™ will stay in learn mode for three minutes.
Press the Learn button twice on the primary operator (the operator will
beep as it enters learn mode). The LiftMaster Internet Gateway™ will
pair to the operator if it is within range and the operator will beep if
programming is successful.
Outside
Property
Inside
Property
!
!
2
1
3
4
Comm Link Data A
Comm Link Data B
Comm Link Data A
Comm Link Data B
Before digging, contact local underground utility locating companies. Use PVC conduit to prevent damage to cables.
1
Trench across driveway to bury the extension cable.
2
Connect the wires from the extension cable to the Comm Link terminals on
the primary gate operator control board.
3
Route the extension cable to the secondary gate operator's control board.
4
Connect the wires from the extension cable to the Comm Link terminals on
the secondary control board (Comm Link A to Comm Link A and Comm Link B
to Comm Link B).
There are two options for dual gate communication: wired or wireless. Follow the directions according to your application. Do not use wired and
wireless communication simultaneously. Model CSL24V is shown for illustration purposes.
Wired dual gate applications will have a longer battery standby
time than wireless applications.
DUAL GATE WIRE TYPE (STRANDED COPPER WIRE)
22AWG up to 200 feet (61 m)
18AWG - 200-1000 feet
(61-305 m)
Wire must be rated at 30 Volt minimum
DUAL GATE CONFIGURATION
WIRED DUAL GATES
LIFTMASTER INTERNET GATEWAY™
1
To program the operator to the LiftMaster Internet Gateway™:
2
3
4
1
2
3
4
5
OR
The status as shown by the LiftMaster Internet Gateway™ app will be either “open” or “closed”. The gate operator can then be controlled through the LiftMaster Internet
Gateway™ app.
USING THE LEARN BUTTON ON THE OPERATOR’S CONTROL BOARD
USING THE RESET SWITCH ON THE OPERATOR
5
6
6
7
8