The boiler is suitable for sealed systems only. The

maximum cold water mains pressure for the appliance is 10
bar. All fittings and pipework connected to the appliance
should be of the same standard.  If there is a possibility of
the incoming mains pressure exceeding 10 bar, particularly
at night, then a suitable pressure limiting valve must be
fitted. 

The boiler is designed to provide hot water on demand. If
there is a requirement for greater demands, for example if
the property has several bathrooms and cloakrooms, a
vented or unvented hot water storage system should be
used.

Showers

Any shower valves used with the appliance should be of a
thermostatic or pressure balanced type. Refer to the shower
manufacturer for performance guidance and suitability.

Flushing and Water Treatment

The performance of the appliance could be impaired by
system debris or the effects of corrosion. The system must
be flushed thoroughly to remove metal filings, solder,
machining oils and other fluxes and greases before
connecting the boiler. If it is an existing system, an
appropriate flushing and descaling agent should be used.
Refer to BS 7593: 1992 for guidance. For more information
on the use of corrosion inhibitors, flushing and descaling
agents, advice can be sought from the manufacturers of
water treatment products such as:

Betz Dearborn Ltd
Foundry Lane
Widnes
Cheshire
WA8 8UD
Tel: (0151) 424 5351

Fernox Manufacturing
Britannica Works
Clavering
Essex
CB11 4QZ
Tel: (01799) 550811

System Controls

The boiler is electrically controlled and is suitable for most
modern electronic time and temperature controls. The
addition of such external controls can be beneficial to the
efficient operation of the system. The boiler connections for
external controls are 24V and so only controls of 24V or that
have voltage free contacts should be used.

By-pass and Pump

The boiler is fitted with an automatic by-pass. .

Expansion Vessel

The expansion vessel is pre-charged to 0.7 bar (10 lb/in

2

).

The vessel is suitable for systems up to 145 litres capacity.
For systems of greater capacity an additional expansion
vessel will be required. Refer to the chart below and BS
7074 pt 1 or BS 5449.

Filling Point

Provision must be made to be able to charge the system on
commissioning and to make up any subsequent pressure
loss.
The method of connection must utilise approved equipment
and must comply with the water regulations. A filling loop
can be installed so as to be hidden beneath the boiler.

20

40

60

80

100

120

Pf

140

160

180

200

220

240

0,7

0,8

0,9

1,0

1,1

1,2

1,3

1,4

1,5

1,6

1,7

1,8

1,9

2,0

Capacité maximale de l'installation (en litres)

80

°

C

70

°

C

60

°

C

50

°

C

40

°

C

260

Pression à froid pour le circuit chauffage (en bar)

Liters

Pressure

System capacity chart

Fig. 15

System Guidance

Summary of Contents for Calydra comfort 100

Page 1: ...d Operating Instructions 1 2 3 0 4 bar 1 2 3 0 4 bar c Calydra comfort 100 c c G C N 47 980 21 PLEASE LEAVE THESE INSTRUCTIONS WITH THE END USER GB IE U n i t 3 A T h o r n t o n R o a d I n d E s t a t e O f f H o c k n e y R o a d B r a d f o r d B D 8 9 H Q 0 1 2 7 4 4 8 8 3 8 8 w w w h e a t i n g s p a r e s 2 4 7 c o m ...

Page 2: ...ll your Gas Supplier immediately If you are going away for a long period of time remember to shut the mains gas tap or the gas cylinder valve Before any intervention within the boiler it is first necessary to isolate the electrical power supply by turning the external switch to OFF TO CONTACT C M SERVICE PLEASE CALL THE NATIONAL WARRANTY HELPLINE ON 0870 600 9888 To The Installer As part of the co...

Page 3: ...of the requirements In IE the requirements given under the current edition of I S 813 must be followed installation must also comply with the current bylaws of Local Water Undertakings Installation should also be carried out in accordance with Building Regulations Local Authority Building Standards Scotland Regulations and current editions of the following British Standards Codes of practice BS 75...

Page 4: ... 4 5 6 7 12 13 11 14 Fig 1 K 20 Description conjunction with the Chaffoteaux Maury low pressure instantaneous domestic hot water system The Calydra comfort as well as providing hot water provides central heating The boiler is designed for sealed systems only A one speed circulating pump diverter valve expansion vessel as well as a pressure gauge and safety valve are included within the boiler The ...

Page 5: ...tural Gas G20 in mm 1 28 Calydra comfort 100 Propane L P G G31 Gas rate Maximum in kg h 2 42 Maximum in ft3 h 44 8 Inlet pressure Nominal in mbar 37 Nominal in in wg 14 8 Burner pressure Nominal in mbar 30 4 Nominal in in wg 12 2 Butane L P G G30 Gas rate Maximum in kg h 2 45 Maximum in Lbs h 5 40 Inlet pressure Nominal in mbar 28 Nominal in in wg 11 2 Burner pressure Nominal in mbar 24 Nominal in...

Page 6: ...15 mm J Central Heating flow ø 22 mm K D H W outlet ø 15 mm L Gas supply ø 22 mm M Cold water inlet ø 15 mm N Central Heating return ø 22 mm Outer case dimensions Width 440 minimum space required 450 Height 850 Depth 380 Minimum clearances Both sides 5 mm Above casing 170 mm Below casing 200 mm Front for servicing 500 mm Front in operation 5 mm J K L M N I 54 54 54 54 68 360 260 50 50 738 850 380 ...

Page 7: ...tion of hot water delivery or recovery of the mini cylinder When the boiler has been in standby in hot water mode for some time or when drawing D H W at flow rates of less than 2 l min the temperature in the mini cylinder will eventually decrease and the TSS control thermistor f Fig 6 will call for heat Causing the pump and burner to operate until the TSS thermistor is satisfied 5 Fig 5 Fig 6 Cent...

Page 8: ...car port into the dwelling1200 mm M Vertically from a terminal on the same wall 1500 mm N Horizontally from a terminal on the same wall 300 mm Q Fixed by Ubbink Rolux 4 GM flue terminal It may be necessary to protect the terminal with a guard Reference should be made to the Building Regulations for guidance Suitable guards may be obtained from the following manufacturer Quinnel Barret Quinnel Wire...

Page 9: ...existing boilers such as old Chaffoteaux et Maury models Before fitting the tails onto the connecting bracket please check the correct location of the flow restrictor L fig 10 on the main inlet Safety Valve Drains The pressure relief valve tube is clear silicone It should terminate below the boiler over a tundish or 22 mm pipe see I Fig 4 which should in turn discharge safely outside the premises ...

Page 10: ...across pins as shown Fig 14 After completing the adjustments replace the rubber cover and refit the outer casing C10 C10 C11 C11 C38 C38 F1 F1 F1A F1A J1 J1 J2 J2 J5 J5 MV1 MV1 R67 R67 R72 R72 R73 R73 R75 R75 R76 R76 R85 R85 1 2 HOR N L TH ER M OS TA T N L J1 0 J1 1 23 0 V P3 Fig 13 Fig 12 P3 P4 P5 mini maxi P3 Detail P3 P3 1 3 3 3 P3 1 3 P3 P4 P5 J1 J2 S Connector D T A Mains supply cable Room th...

Page 11: ... WA8 8UD Tel 0151 424 5351 Fernox Manufacturing Britannica Works Clavering Essex CB11 4QZ Tel 01799 550811 System Controls The boiler is electrically controlled and is suitable for most modern electronic time and temperature controls The addition of such external controls can be beneficial to the efficient operation of the system The boiler connections for external controls are 24V and so only con...

Page 12: ...sure by connecting a gas pressure gauge to test point 14 Fig 16 working pressure while boiler is operating in hot water mode Refer to technical data Check the operation of the boiler controls and safety devices see separate servicing leaflet for details Set the by pass Refer to system guidance Re flush the system to remove any dissolved oils and fluxes Recharge system pressure and introduce any wa...

Page 13: ... while the hot water is being delivered The boiler will switch back automatically to heating when the tap is turned off Note If the boiler has been turned off for some time the first attempt to light it may result in a lock out If this happens press the reset button 30 and the boiler will light To Turn Boiler Off Completely 1 Turn the main switch 23 to the off position O 2 Turn the gas service val...

Page 14: ... for Setting the Built in Clock Helpful suggestions Periodically check the system pressure using the pressure gauge and make sure that the pressure is between 1 0 and 1 5 bar when the system is off and cool If the pressure is below the minimum recommended value the pressure must be brought into the acceptable range Consult your installer for checking and refilling the system If the pressure level ...

Page 15: ...external electrical supply check that the gas supply is on should there still be a problem contact your local service centre Contact your local service centre Turn up the room thermostat Wait for a few minutes Press the reset button 36 fig 21 the red led will go out and the boiler attempts to re light If the red indicator lights too frequently please call your local service centre Purge of air the...

Page 16: ...mited MTS Building Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone 01494 755600 Fax 01494 459775 Internet www chaffoteaux co uk E mail info uk mtsgroup com Technical Support Help Line 0870 241 8180 Customer Service Help Desk 0870 600 9888 This appliance is suitable for Natural gas or LPG A gas conversion must be made by a competent person U n i t 3 A T h o r n t o n R o a d I n d E s t a t ...