3
INSTALLATION INSTRUCTIONS
FOR QUALIFIED GAS INSTALLER
Unpacking
Carefully undo strapping to separate loose parts and remove all plastic
protective sheeting.
Positioning and Sizing
Confirm that the size of Fireplace chosen is the right size for the room.
Connect up according to SANS 10087-1
Connect a copper pipe from the gas supply via a regulator, complying with
SANS 1237, to the Ø8 compression fitting on the control valve, taking into
account the distance from the gas supply, to calculate the size of the copper
pipe.
Setting up
1. Insert the burner with the venturi facing the gas jet, and ensure the burner is
seated correctly.
2. Fill the burner with the special
black
radiant ceramic ash or glass chips.
3. Spread the decorative stone or ceramic evenly around the burner.
4. Place the coals or pebbles in a single layer, double row, spread across the
burner, allowing about 10mm gaps between them.
5.
Use only the number of pebbles or coals supplied
Testing and Commissioning
Turn on the gas supply and test for leaks with soapy water.
Ensure that the
WORKING PRESSURE is 2,8 kPa at the control valve
.
See checklist.
Briefing the customer
All instructions must be handed over to the user for safekeeping. Instruct the
customer how to turn the gas on and off and how to light and control the fire.
After commissioning the unit the customer should be instructed on the safe
use of it and the need for regular servicing. Frequency of service depends on
usage, but must be carried out at the first sign of malfunction and at least
once in 2 years.