CGEO INTERNATIONAL LIMITED CGEO-SG5 Installation Manual Download Page 9

CGEO-SG5

 

Rebar VW Strain Gauge                                                                                                                                        8 

CGEO INTERNATIONAL LIMITED 

                                                                              Installation Manual           

3. TAKING READINGS 

3.1. Operation of the BSIL-RO-VW Readout Box 

BSIL-RO-VW readout is suitable for all BSIL vibrating wire sensors. 
 
Connect the Readout using the flying leads or in the case of a terminal station, with a connector. 
The red and black clips are for the vibrating wire gage, the white and green clips are for the 
thermistor and the blue for the shield drain wire. 
 
1.

 

Turn  the  display  selector  to  position  "B".  Readout  is  frequency  module  and  temperature 
in

 ℃

.   

 
2.

 

Turn the unit on and a reading will appear in the front display window. The last digit may 
change one or two digits while reading. Press the "Store" button to record the value 
displayed. If the no reading displays or the reading is unstable see section 5 for 
troubleshooting suggestions. The thermistor will be read and output directly in degrees 
centigrade.   

 
3.

 

Turn  off  the  readout.    Or  the  unit  will  automatically  turn  itself  off  after  approximately  15 
minutes to conserve power.   

 

3.2. Measuring Temperatures 

 
Each  Vibrating  Wire  Rebar  Strain  Gauge  is  equipped  with  a  thermistor  for  reading 
temperature.  The  thermistor  gives  a  varying  resistance  output  as  the  temperature  changes. 
Usually  the  white  and  green  leads  are  connected  to  the  internal  thermistor.  BSIL-RO-VW 
readout  will  read  the  thermistor  and  display  temperature  by  connecting  its  white  and  green 
leads to white and green leads of rebar strain gauge. 
 
Following is instruction of using ohmmeter to read temperature: 
 
1.

 

Connect the ohmmeter to the two thermistor leads coming from the Strain Gauge. (Since 
the resistance changes with temperature are so large, the effect of cable resistance is usually 
insignificant.)   

 
2.

 

Look up the temperature for the measured resistance in Table B-1. Alternately the 
temperature could be calculated using Equation B-1.   

 

 

 

 
 
 
 
 
 

Summary of Contents for CGEO-SG5

Page 1: ...CGEO INTERNATIONAL LIMITED Model CGEO SG5 Rebar Vibrating Wire Strain Gauge Installation Manual ...

Page 2: ...CGEO SG5 Rebar VW Strain Gauge 1 CGEO INTERNATIONAL LIMITED Installation Manual ...

Page 3: ... 2 2 2 Model CGEO SG5 12 Sister Bar 6 2 3 Cable Installation 7 3 TAKING READINGS 8 3 1 Operation of the BSIL RO VW Readout Box 8 3 2 Measuring Temperatures 8 4 DATA REDUCTION 9 4 1 Strain Calculation 9 4 2 Temperature Correction 9 4 3 Environmental Factors 10 5 TROUBLESHOOTING 13 APPENDIX A SPECIFICATIONS 14 A 1 Rebar Strain Gauges 14 A 2 Thermistor see Appendix B also 14 APPENDIX B THERMISTOR TEM...

Page 4: ... a compression fitting See Figure 1 Rebar Strain Gauge Body Strain Gage Electromagnetic Coil Heat Shrink Weld Rebar Weld Thermistor Compression Fitting Instrument Cable 900 mm Figure 1 Model CGEO SG5 Rebar Strain Gauge The Model CGEO SG5 12 diameter 12 Vibrating Wire Rebar Strain Gauge or Sister Bar consists of a short length of high strength steel welded between two long sections of reinforcing b...

Page 5: ...t differ by more than about 25 digits 10 microstrain Shipping shocks may however cause larger shifts If the reading is within 100 digits 40 microstrain of the factory zero and is stable it is safe to proceed with the installation By pulling on the Strain Gauge it should be possible to change the readout digits causing them to rise as tension increases Checks of electrical continuity can also be ma...

Page 6: ...ags between the weld area and the coil housing Also take care not to damage or burn the instrument cable when welding After welding route the instrument cable along the rebar system and tie it off every 3 4 feet 1 meter using nylon cable ties Avoid using iron tie wire to secure the cable as the cable could be cut Be sure when installing the Strain Gauges to note the location and serial numbers of ...

Page 7: ... Figures 4 and 5 Route the instrument cable along the rebar system and tie it off every 3 4 feet 1 meter using nylon cable ties Avoid using the tie wire on the instrument cable as it could cut the cable Be sure when installing the Strain Gauges to note the location and serial numbers of all instruments This is necessary for applying the proper calibration factors and determining load characteristi...

Page 8: ...As noted in the installation sections route the instrument cables along the structural rebar and tie off using nylon cable ties every 2 3 feet 1 meter to secure Outside of the instrumented structure the cable should be protected from accidental damage caused by moving equipment or other construction activity Cables may be spliced to lengthen them without affecting gage readings Always waterproof t...

Page 9: ...gestions The thermistor will be read and output directly in degrees centigrade 3 Turn off the readout Or the unit will automatically turn itself off after approximately 15 minutes to conserve power 3 2 Measuring Temperatures Each Vibrating Wire Rebar Strain Gauge is equipped with a thermistor for reading temperature The thermistor gives a varying resistance output as the temperature changes Usuall...

Page 10: ...t reading R1 of 7700 and a calibration factor G of 0 718439 microstrain per digit F 7700 8000 0 718439 215 5217 compression Symbol rule compression tension 4 2 Temperature Correction Rebar Strain Gauges are usually embedded in concrete and strained by the concrete the assumption being that the strain in the meter is equal to the strain in the concrete When the temperature changes the concrete expa...

Page 11: ...of the Strain Gauge installation is to monitor site conditions factors which may affect these conditions should be observed and recorded Seemingly minor effects may have a real influence on the behavior of the structure being monitored and may give an early indication of potential problems Some of these factors include but are not limited to blasting rainfall tidal or reservoir levels excavation a...

Page 12: ...8 02 0 05 28 01 0 03 35 0 6223 5 6222 5 6222 7 6222 9 34 98 0 05 35 00 0 01 Linear F G R1 R0 K T1 T0 Polynomial F AR1 2 BR1 C K T1 T0 kN Linear Gage Factor G 0 019589kN Digit kN Polynomial Gage Factor A B C Thermal Factor K 0 01517kN R0 Original reading T0 Original temperature CGEO INTERNATIONAL LIMITED Room 06 13A F South Tower World Finance Centre HarbourCity 17 Canton Road Tsim Sha Tsui Kowloon...

Page 13: ...CGEO SG5 Rebar VW Strain Gauge 12 CGEO INTERNATIONAL LIMITED Installation Manual Figure 6 Sample Model CGEO SG5 Calibration Sheet ...

Page 14: ...obable sources of electrical noise are motors generators and antennas Make sure the shield drain wire is connected to ground whether using a portable readout or datalogger Check whether the connection of readout and strain gauge s leads is well Does the readout work with another Strain Gauge If not the readout may have a low battery or be malfunctioning Symptom Strain Gauge Fails to Read Is the ca...

Page 15: ...Pa 2000με Diameter 12mm 14 16 18 20 22 25 28 32 36 40mm 25 28 32 36 40mm Accuracy 0 25 F S Resolution 0 016 F S Temperature Range 20 80 Water Proof customized 0 5 2MPa available or others Connecting Bar high strength whorl steel or steel Table A 1 Model CGEO SG5 Rebar Strain Gauge Specifications Notes Consult the factory for other sizes available A 2 Thermistor see Appendix B also Range 80 to 150 ...

Page 16: ... 4 82 110 8 122 82 87K 37 8417 3 1418 43 342 2 83 107 9 123 77 66K 36 8006 4 1363 44 331 5 84 105 2 124 72 81K 35 7618 5 1310 45 321 2 85 102 5 125 68 30K 34 7252 6 1260 46 311 3 86 99 9 126 64 09K 33 6905 7 1212 47 301 7 87 97 3 127 60 17K 32 6576 8 1167 48 292 4 88 94 9 128 56 51K 31 6265 9 1123 49 283 5 89 92 5 129 53 10K 30 5971 10 1081 50 274 9 90 90 2 130 49 91K 29 5692 11 1040 51 266 6 91 8...

Reviews: