
CET Electric Technology
17
5.5.3
Max. Demand of Last Month (Before Last Reset)
Register
Property
Description
Format
Scale
Unit
3600~3605
RO
U
See
x1
U
3606~3611
RO
I
A
3612~3617
RO
P
kW
3618~3623
RO
Q
kvar
3624~3629
RO
S
kVA
Table 5-7 Max. Demand of Last Month
5.5.4
Demand Data Structure
Offset
Format
Description
+0
High-order Byte
INT16
Year – 2000 (0-37)
Low-order Byte
Month (1-12)
+1
High-order Byte
INT16
Day (1-31)
Low-order Byte
Hour (0-23)
+2
High-order Byte
INT16
Minute (0-59)
Low-order Byte
Second (0-59)
+3
-
INT16
Millisecond (0 to 999)
+4~+5
-
Float
Record Value
Table 5-8 Demand Data Structure
5.6
Logs
5.6.1
Monthly Energy Log
Register
Property
Description
Format
Scale
Unit
0980
RW
Month
INT16
0 to 12
0981
RO
High-order Byte: Year (0-37)
Low-order Byte: Month (1-12)
INT16
Time Stamp
(20YY/MM/DD
HH:MM:SS)
0982
RO
High-order Byte: Day (1-31)
Low-order Byte: Hour (0-23)
INT16
0983
RO
High-order Byte: Minute (0-59)
Low-order Byte: Second (0-59)
INT16
0984
RO
kWh Import
INT32
x0.01
kWh
0986
RO
kWh Export
INT32
0988
RO
kvarh Import
INT32
kvarh
0990
RO
kvarh Export
INT32
0992
RO
kVAh
INT32
kVAh
0994
RO
kWh Import of T1
INT32
kWh
0996
RO
kWh Export of T1
INT32
0998
RO
kvarh Import of T1
INT32
kvarh
1000
RO
kvarh Export of T1
INT32
1002
RO
kVAh of T1
INT32
kVAh
1004~1022
RO
…
INT32
…
1024
RO
kWh Import of T4
INT32
kWh
1026
RO
kWh Export of T4
INT32
1028
RO
kvarh Import of T4
INT32
kvarh
1030
RO
kvarh Export of T4
INT32
1032
RO
kVAh of T4
INT32
kVAh
Table 5-9 Monthly Energy Log
Notes:
1.
This register represents the Month when it is read. To read the Monthly Energy Log, this register must be first written to indicate to
the PMC-230 which log to load from memory. The range of this register is from 0 to 12, which represents the Present Month and the
Last 12 Months. For example, if the current month is 2016/10, “0” means 2016/10, “1” means 2016/09, “2” means 2016/08, ……”12”
means “2015/10”.
2.
For each Monthly Energy Log, the time stamp shows the exact self-read time (20YY/MM/DD HH:MM:SS) when the log was recorded.
For the Monthly Energy Log of the Present Month, the time stamp shows the current time of the meter because the present month is
not yet over.
3.
T1 to T4 means Tariff 1 to Tariff 4.