FILTER POSITION
The filter base should be positioned on a perfectly flat and level surface.
The filter should be installed in a readily accessible place for ease of inspection and
maintenance.
INSTALLATION OF THE VALVE BATTERY
The valve battery may be supplied with 4 or 5 valves depending on the selected
model.
Threaded union (fig 4)or flanged connections (fig 5) are supplied depending on the
connection size
Fig. 4
Fig. 5
MIn. 60 cm.
250
MIn. 60 cm.
M
in
. 8
0
c
m
.
À Ecloument
Rétour
Fig. 3