background image

  INTRODUCTION

These Instructions cover a range of direct, floor
mounted, gas fired, condensing pool heaters which
are room sealed and fan assisted. The flue system
available is concentric, left, right, rear, and vertical,
all up to 20 metres ‘FEL’. There is also an Outdoor
Top terminal for use where the Heater is installed out
of doors. The ignition system is fully automatic.

There are two models with different outputs - see
the 

Technical Data on Inside Cover 

for details.

Both can be installed in multiples to obtain a larger,
combined output.

The casing is of green and black polyester powder
coated mild steel. The Heaters use a high perform-
ance stainless steel heat exchanger and are suit-
able for connection to pools using chlorinated and
salt chorinated water provided the following levels of
chemicals are maintained.

pH

7.2 to 7.8

Total Alkalinity

80 to 140 ppm

Calcium Hardness

200 to 400 ppm

Salt maximum

6000 ppm

Free Chlorine

1 to 4 ppm

All chemicals must be introduced and completely
diluted into the pool water before being circulated
through the heater. Do not place chlorine tablets or
bromine sticks in the skimmer, high chemical
concentrations will result when the pump is not
running.

Chlorinators must feed downstream of the heater
and have an anti-siphoning device to prevent
chemical back-up into the heater when the pump is
shut off.

NOTE: 

High chemical concentrates from feeders

and chlorinators that are out of adjustment will
cause  corrosion to the heat exchanger in the
heaters. Such damage is not covered under the
warranty.

Gas Safety (Installation and Use)
Regulations, (as amended).

It is the law that all gas appliances are installed by a
competent person (e.g. a CORGI registered opera-
tive) in accordance with the above Regulations.
Failure to install appliances correctly could lead to
prosecution.

It is in your own interest, and that of safety, to
ensure that the law is complied with. The installation
of the Heater MUST also be in accordance with the
current I.E.E.. Wiring Regulations, the Local Build-
ing Regulations, Building Standards (Scotland), the
Bye Laws of the Local Water Undertaking, any
relevant requirements of the Local Authority, and

Health and Safety document No 635, “Electricity at
Work Regulations”.
Detailed recommendations are contained in the
following British Standard Codes of Practice.

Codes of Practice.

BS.6798 Installation of gas fired hot water boilers of
rated input not exceeding 70kW.
BS.5440: Part1 and Part 2. Flues (for gas appli-
ances of rated input not exceeding 60kW).
BS 6891 Specification for installation of low pressure
gas pipework.
BS5482:1 Code of practice for domestic butane &
propane gas burning installations.
Building Regulations Part L1.

IMPORTANT.

 

It is important that no external

control devices are directly connected to this appli-
ance - unless covered by these ‘Installation and
Servicing Instructions’ or otherwise recommended
by the manufacturer. If in doubt, please enquire.
Any direct connection of a control device not
recommended by the manufacturer could infringe
the Gas Safety (Installation & Use) Regulations, the
above regulations and the normal appliance war-
ranty.

Manufacturer’s notes must NOT be taken, in any
way, as overriding statutory obligations.

Location of Heater

The Heater MUST be installed on a flat and level
floor, capable of adequately supporting the weight of
the Heater and any ancillary equipment.
Provision is provided for the heater to be fixed to the
floor.
It is IP 44 Rated and can be installed out of doors in a
suitable position. In all cases the choice of position
should take into account the flue, the plume and the
condensate drainage.

IMPORTANT NOTICE.

If the Heater is to be fitted in a timber framed build-
ing it should be fitted in accordance with the British
Gas publication ‘Guide for Gas Installations in
Timber Frame Housing’, reference DM2. If in doubt,
advice must be sought from the Local Gas Region of
British Gas.

The Heater may be installed in any room or internal
space. Particular attention is drawn to the require-
ments of the current I.E.E Wiring regulations and, in
Scotland, the electrical provisions of the Building
Regulations applicable to Scotland with respect to
the installation of the boiler in a room or internal
space containing a bath or shower.

Where a room sealed appliance is installed in a
room containing a bath or shower then the appliance
and any electrical switch or appliance control,
utilising mains electricity should be so situated that it

Condensing Pool Heater

     

3

           14/11/06

Summary of Contents for MB35C

Page 1: ...LL GAS Do not try to light any appliance Do not touch any electrical switch do not use any phone in your building Immediately call your gas supplier from a neighbour s phone Follow the gas supplier s instructions Installation and service must be performed by a Corgi registered installer Operating Installation and Servicing Instructions for Condensing Pool Spa Heaters M1996 Models MB35C MB50C 0087 ...

Page 2: ... OUTPUT Btu h 117 500 168 000 117 500 168 800 GAS RATE NG m3 h 3 37 4 88 1 28 1 9 MAXIMUM RATE OUTDOOR TOP CO 120 80 99 130 COMBUSTION SETTINGS NG CO2 8 4 9 3 9 4 10 2 OFFSET SETTING pA 3 0 3 0 3 0 3 0 ORIFICE mm 4 3 5 2 GENERAL SPECIFICATIONS WATERCONTENT MB35C 3 75 Litres 0 83 gallons MB50C 4 45 Litres 1 0 gallons MAXIMUM WATER PRESSURE 5 bar 70 psi MAXIMUM WATER FLOW TEMP Pool 32 C 90 F Spa 41 ...

Page 3: ...ICING 23 Routine Service 23 Changing Components 23 Spares 26 Heater Components 27 List of Figures Page Fig 1 0 Terminal Positions 4 Fig 2 0 Hydraulic Resistance Graph 5 Fig 3 0 Service Access Pipe Connections 7 Fig 3 1 Wall Terminal Dimensions 7 Fig 3 2 Outdoor Terminal Dimensions 8 Fig 3 3 Roof Terminal Dimensions 8 Fig 4 0 Wall Terminal Installation 9 Fig 4 1 Extended Wall Terminal Installation ...

Page 4: ...e Pool is not up to temperature Flashing The Pool Heating Demand is met the pool is up to temperature Condensing Pool Heater 1 14 11 06 Genie USER S OPERATING INSTRUCTIONS FOR YOUR SAFETY READ BEFORE OPERATING WARNING IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTLY A FIRE OR EXPLOSION MAY RESULT CAUSING PROPERTY DAMAGE PERSONAL INJURY OR LOSS OF LIFE This appliance is equipped with an ignition dev...

Page 5: ...reduces the power to maximise control For certain installa tion designs if the pool is used before it is up to set temperature the water entering the pool from the Heater could be noticeably warmer than the pool This is not a fault but part of the design It will reduce for the final degree up to set temperature CAUTION Elevated water temperature can be hazardous and the U S Consumer Product Safety...

Page 6: ...l Authority and Health and Safety document No 635 Electricity at Work Regulations Detailed recommendations are contained in the following British Standard Codes of Practice Codes of Practice BS 6798 Installation of gas fired hot water boilers of rated input not exceeding 70kW BS 5440 Part1 and Part 2 Flues for gas appli ances of rated input not exceeding 60kW BS 6891 Specification for installation...

Page 7: ...d for NG and can be con verted to LPG by the addition of an Propane Orifice which is supplied with the heater See page 12 for conversion instructions Flueing Only flue components specified by the Manufacturer should be used with these appliances Detailed recommendations for flueing are given in BS 5440 The following notes are intended for general guidance 1 Be aware of the plume from the flue and ...

Page 8: ... A 75mm condensate trap is provided on the Heater and is satisfactory when connected to Soakaways Gullies Rainwater Pipework and Internal Drainage systems All pipework and fittings in the condensate drainage system MUST be made of plastic unless they carry other liquid waste No other materials may be used The pipework should be insulated if run out of doors The drain outlet on the boiler is Osma 4...

Page 9: ...f concentric flue 1 0 2 metres of concentric flue 2 0 A 45 degree concentric bend 1 1 A 90 degree concentric bend 1 5 A concentric Roof Terminal 3 3 A concentric Wall Terminal 3 9 Sum the Flue Equivalant Lengths used in the design this must not exceed 20 metres Condensing Pool Heater 6 14 11 06 Assembly All items assemble by a push fit clamp system If it is required to lubricate the seals only Cen...

Page 10: ...K E D F Connections D Multi Heater Connection E External Control CCP01 F Electric In G Gas Supply 22mm Copper H Condensate Drain 40 1mm Hunter Plastic J From Pool 1 Plastic Demountable Fittings K To Pool 1 Plastic Demountable Fittings Fig 3 1 Service Access Left Right or Above 300mm In Front 800mm Rear Flue Left Right Flue Horizontal Wall Terminal Dimensions Horizontal Wall Terminal MBHT SW WT WT ...

Page 11: ...Terminal MBOT Fig 3 3 Clamp Assembly Screw Pitched Roof Installation Vertical Roof Terminal Dimensions Flat Roof Installation 500 500 Use Seldeck Flashing System for all Roof Installations Vertical Roof Terminal MBVT 1 metre Horizontal Vertical Extension Pipe MBHVE 45 degree bends MB45DB ...

Page 12: ...al Roof Terminal n a n a Yes MBOT Outdoor Terminal Yes n a n a MB45DB 45 degree bend n a Optional Optional MB90DB 90 degree bend n a Optional n a Outdoor Terminal Extended Horizontal Wall Terminal Extended Vertical Roof Terminal Horizontal Wall Terminal MBOT MB90DB MBHVE MBHT not shown TOOFFSET USEMB45DB MB90DB MBHT not shown MBVT MBHVE TOOFFSET USEMB45DB Fig 4 3 Fig 4 0 Fig 4 1 Fig 4 2 Determine ...

Page 13: ...rtical Roof Terminal 3 3m MBOT Outdoor Terminal n a MB45DB 45 degree bends pair 1 1m MB90DB 90 degree bend 1 5m Flue Equivalent Length m The Maximum Flue Equivalent Length FEL permitted is 20 metres horizontal or vertical The Flue Kits available below list the FEL for each component Add up all the FEL s used in your design and check that this does not exceed 20 metres see page 6 per bend ...

Page 14: ...e drill diameter required is 175 mm If a level hole is being drilled its size will be determined by the wall thickness Wall Thickness Core Drill diameter 150 240 mm 175 mm 240 330 mm 185 mm 330 420 mm 195 mm 420 500 mm 205 mm Because of the incline of the flue the height of the centre of the flue hole on the inside will be determined by the distance the heater is from the wall 1 Ensure the require...

Page 15: ... before the Heater will operate It is very important to verify that it turns off when the water flow is interrupted It has an adjustment range equivalant to 1 5 metres The switch is factory set for most conditions but can be altered if required 1 With the pump on turn the knurled nut clockwise until a click is heard 2 Turn the nut anti clockwise a quarter of a turn 3 Turn the pump on and off to ch...

Page 16: ...ink trap as the solids and fats in the drain will cause a blockage It is permissible to connect to an external gully or rain water hopper provided they connect to a combined system The condensate should not be run into a grey water system If the condensate pipe is connected to a stack it should join not less than 450 mm above the foot of the stack In addition it should be positioned so there no ch...

Page 17: ...rain Cap Condensate Syphon 75 mm Condensing Pool Heater 14 14 11 06 Fig 7 1 Removable Plate Use to close off unused Waste exit on panels 1 20 Fall 2 5 Degrees Strap On Boss 200mm Land Drain Filled with Lime chippings 400mm deep Insulate against freezing Note Do not reduce the pipe size below the 40mm provided Fig 7 0 Soakaway Stack Attachment Soil Pipe or Drain ...

Page 18: ...NG The appliance MUST be earthed All wiring for the Heater and system controls MUST conform to I E E Wiring Regulations and work should be tested using a suitable meter for Earth Continuity Polarity Short Circuit and Resistance to Earth The Heater supply must be through a common isolator a double pole 3A fused isolating switch with a contact separation of 3mm minimum on both poles The cable used s...

Page 19: ...h OFF then back ON again The Control will now display in Centigrade 3 4 5 6 2 1 7 Lock Reset Button On Off Switch Temperature Display PoolTemperature Setting Knob Setup Mode Setting Factory Setting Alternative Display Indicator 1 Display units F Fahrenheit C Centigrade F or C 2 Maximum temperature 32 C 90 F 41 C 106 F PL or SPA 3 Pressure Log Number of Operations Resets to zero Yellow LED ON 4 Ove...

Page 20: ...ly slide out until fully accessible Fig 10 0 Carefully fit the Adapter PCB in the space behind the Pool Temp Display on the Board Fig 10 0 ensuring that the six pins on the Board pass through the underside of the Adapter PCB and that the plastic locking pillars snap into place Refit Pool Thermostat Board and Knob Repeat steps 1 and 2 for all the Heaters Using the supplied cables pass them through ...

Page 21: ... which its Pressure Switch detects the burner will stop immediately and the Filter LED will light It will no longer be available to the group It will then check every 3 minutes or so to see if the problem has been corrected the Filter LED will flash It will put itself back in the group if flow is satisfactory The Master display can be altered in Setup Mode like a single Heater see Page 16 Unlike a...

Page 22: ...10 ohms X12 13 Bk B 1 240v 3 Wire X12 2 X12 10 X1 7 X1 9 X1 2 Flue 230V 50Hz L N SL LINK Remove if seperate switched live provided WATER PRESSURE SWITCH Gy P P Gy Gy Bk Or V P R B R B Gy Bk P V Or Gy V B Br G Y Br B Br B B Y Y Bk Br Br Bk R Gy R Bk W W G G Gy Bk Bk Bk W V Gy HEAT DEMAND LOCKOUT ALARM FAN 230v L N N FAN TACHO RESET ve HI LIMIT HI LIMIT FAN PWM MODULATION ve RESET ve FAN ve FAN ve M...

Page 23: ...ring Mode This is a special mode used to set the operation of the Control and to investigate fault conditions it requires a Special Connector available from your supplier It is recommended that none of the settings are altered without consultation with the manufacturer Turn the Heater OFF with Panel Switch Remove the Front Top Panel and the Electrical Chassis Cover Pull off the PCB connector for t...

Page 24: ...cool then investigate in Engineering Mode Reset with Button OH2 Flue gas over temperature Allow to cool then investigate in Engineering Mode Reset with Button GAS Gas Control Lockout Unable to light burner reset with Button OR Flue Stat tripped Investigate cause Reset on Flue Stat HI Condensate level high Blocked Clear obstruction and allow control to auto reset FRONT PANEL ON PCB EXPLANATION OFF ...

Page 25: ...cuit F alternating with oc Heat Ex changer Flow sensor open circuit H alternating with oc Heat Exchanger Combustion sensor open circuit H alternating with cc Heat Exchanger Combustion sensor short circuit F alternating with cc Heat Ex changer Flow sensor short circuit Err alternating with 4 Pool potentiometer open circuit Err alternating with 5 Pool potentiometer short circuit For all of the above...

Page 26: ...off the Heater Pull off the HT Lead Undo the two screws retaining the electrode assembly and withdraw Assembly is the reverse Pipework IMPORTANT The Heat Exchanger connections are made using O rings and retaining clamps and should not be strained in any direction Any strain will result in damage to the Heat Exchanger and will not be covered by the warranty All plastic pipework joints are solvent w...

Page 27: ...e sensor from the connection Transfer the push on electrical connectors to the replacement and clip back on Condensing Pool Heater 24 14 11 06 Heat Exchanger Combustion Temperature Sensor This is located on the top of the Heat Exchanger on the right hand side See Fig 13 1 Release the electrical connector by pressing the latch and pulling up Twist the Sensor a quarter turn clockwise and withdraw IM...

Page 28: ...ctions to the Pool pipework See Fig 13 5 Undo the screws holding the panels around the Demountable connections See Fig 13 5 Release Heat Exchanger from the pipework by removing the screw holding the retaining clips See Fig 13 4 Lower the pipework away from the Heat Ex changer Remove the Front Top Panel and disconnect the Flue Thermostat connections Pull the Air Duct and Flue up and away from the H...

Page 29: ...5 SPMBG016 Water Pressure Switch 650634 SPMB506 HT Lead M2142 SPMBG006 Condensate Syphon M2143 SPMBG007 Condensate Pressure Switch M2144 SPMBG008 Ht Exchanger Combustion Sensor M2145 SPMBG009 Spark Sense Electrode M2146 SPMBG010 Flue Thermostat M2147 SPMBG011 Control Thermostat M2148 SPMBG012 Pool Temperature Sensor M2149 SPMBG013 Ht Exchanger Flow Sensor M2149 SPMBG013 Fig 12 0 Pool Thermostat Re...

Page 30: ...ri Fan Fixing Nuts Ignition Control Gas Cock Shoulder Bolts Offset Tube Venturi Water Pressure Switch Heat Exchanger Flow Sensor Heat Exchanger Control Thermostat Demountable Pool Connections Fig 13 5 Condensate Pressure Switch Heat Exchanger Retaining Clips Flue Adapter Gas Valve HT Lead Spark Sense Electrode Condensate Syphon Combustion Sample Point Pool Temp Sensor Air Tube Throttle ...

Page 31: ...Station Lane Industrial Estate Witney Oxon Tel 01993 778855 Fax 01993 703407 22 11 06 ...

Reviews: