10
5. Once the EBM has been successfully connected to the
UPS and the front panel has been reassembled correctly
the UPS needs to be configured to recognise the EBM
has been installed. To do this, refer to the instructions
on page 16.
6. After installing and configuring the UPS to recognise the
EBM, the protected equipment can then be reconnected
to the UPS. Please make sure the load equipment is
turned off before connecting all loads into the output
C13/C19 ports.
3. Connecting Multiple EBMs
The C300R UPS includes an external battery port that
allows users to connect multiple EBM’s in order to provide
additional backup time. In order to do this please follow the
instructions provided on the next few pages of this manual.
Summary of Contents for C300R
Page 2: ......