Installation Guide for FibeAir IP-20C-HP
Page 154 of 204
Ceragon Proprietary and Confidential
Cable and Shackle Assembly
Once all the screws have been fully fastened, the complete assembly is ready to
be raised via a crane. Make sure to loop the cable through both shackles on the
OCU Rail, as shown in
. You must also loop the cable through all the IP-
20C-HP radio handles in the configuration.
Long U-Bends
Terminations
Cable
Shackles
Figure 47: Raising the Assembly Via Crane