Centrometal Bio-Tec 25 Technical Manual Download Page 4

4

29

GS

CC

GG

ZP

SV

VT

VP

VD

PD

GO

Screw

KV

DC

NV

DO

DO

PD

GO

DO

DN

DN

VI

DT

TU

OS

ZO

A

ZO

DT

TU

OS

BL

Technical manual

 Bio-Tec

Technical manual

 Bio-Tec

In general, characteristics

1.0.  IN GENERAL

Steel  boilers 

Bio-Tec

,  with  an  rated  thermal  output  25,  35  and  45  kW  are 

constructed  for 

wood 

firing  and  aimed  for  heating  of  small  and  middle  sized 

premises. Due to the applied wood gasification principle, wood is totally burned. 
Widely sized combustion chamber enables the firing with wood pieces of 500 mm. 
One filling period lasts min. 4 hours, with the possibility of prolonging it to the whole 
day, if the heating requirement is decreased. 

Boiler has the option of maintaining 

the glow up to 12 hours, making unnecessary to perform firing process in case you 
want to continue firing.

 The functioning of the boiler is steered by the built-in digital 

regulation  system. The  boiler  must  be  connected  to  the  central  heating  system 
through an appropriate number of the CAS water accumulators.

1.1.  

CHARACTERISTICS OF THE Bio-Tec BOILER

The  Bio-Tec  boiler  is  produced  in  compliance  with  the  EN  303-5  norm,  which 
enables  the  required  level  of  functioning  and  minimal  environmental  pollution, 
through the firing with wood. 

 The system of 

flue gases conduction and their additional burning out, enables its high efficiency, 
which  makes  this  product  extremely  economical.  Widely  sized  combustion 
chamber door enables firing with large pieces of wood and a very simple and easy 
cleaning and maintenance. One filling period lasts minimum 4 hours, depending on 
the  nominal  thermal  output.  There  is  also  a  possibility  of  prolonging  the  firing 
process to the entire day, if the heating requirement is decreased. The boiler can 
keep the glow up to 12 hours, during which period it is not necessary to repeat the 
firing process. The flue gases leading system is good optimized. The boiler must be 
connected to the central heating system through the CAS water accumulators. An 
integrated digital regulation system steers the functioning of the boiler, steers the 
circulation  pump  integrated  inside  the  primary  heating  circuit  (boiler-water 
accumulator), steers the circulation pump in the heating circuit (water accumulator-
radiators)  and  steers  the  sanitary  water  pump.  The  steering  system  leads  the 
information  related  to  the  necessity  of  the  additional  fuel  filling  towards  the 
regulation and the room thermostat. The Bio-Tec boiler is very simple to handle, 
while  the  built-in  regulation  enables  its  reliable  functioning.  Through  the 
compulsory connection of the CAS water accumulator to the heating system, the 
optimal functioning of the boiler is achieved and the produced heat is saved, which 
enables  consumption  exactly  according  to  the  need. The  firing  process  can  be 
implemented in suitable period of the day. If the outdoor temperature is not very low, 
the room heating and the sanitary hot water production can be extended to the 
period of few days. The boiler is delivered together with thermal insulation, covered 
by a metal casing and it is pre-wired.

The boiler is aimed for firing with wood.

Cleaning and mainternance of the boiler

Image 11

. - Cleaning of Bio-Tec 35/45

Detail A

Screw M8
(4 pcs.)

Screw M8
(2 pcs.)

Fan flange

ZP - 
DO - 

SV - 
BL - 
GO - 

KV - 
DC - 

Lever for cleaning of flue gas tubes

Bottom openings for cleaning of 

        flue gas chamber

Middle boiler door 

Lateral sides of the bottom fire place

Top opening for cleaning of 

         flue gas tubes

Fan box

Flue chamber with flue gas tubes 

        and turbulators

VT - 
VP - 
NV - 
PD - 
VD - 

DN - 
VI - 

OS - 

Fan

Fan blade

Fan flange holder
Top back casing cover
Lid of opening forflue gas 

        box cleaning

Turbulator holder support

Screw and nut M8

DT - Turbulator support

Shaft 

OS - 
TU - Turbulator 

GS - 

CC - 
GG - 

Shaft 

        5 pcs. for Bio-Tec 35,
        5 pcs. for Bio-Tec 45)

Poker for cleaning of bottom refractory 

        stone (chamotte)

Brush for cleaning of flue gas tubes

Poker for cleaning  of the top chamber

         and flue gas passage
ZO - Wire fuse 

f

3 DIN 11024

Summary of Contents for Bio-Tec 25

Page 1: ...lation volume IMPORTANT Open upper boiler door and close bottom if they open Put fine chopped wood to the top chamber on refractory stone chamotte over the burner nozzle so that the nozzle is not obst...

Page 2: ...in boiler Exhaust gas temperature at nominal heat output Exhaust gas temperature at minimum heat output Exhaust mass flow at nominal heat output Exhaust mass flow at minimum heat output Standby heat l...

Page 3: ...penings the flue gas chamber Upper opening for flue gas tube cleaning Lower refractory stone chamotte 2 parts Regulation of primary and secondary air Flue gas chamber with tubes and turbulators Poker...

Page 4: ...boiler must be connected to the central heating system through the CAS water accumulators An integrated digital regulation system steers the functioning of the boiler steers the circulation pump integ...

Page 5: ...ature This demand for moisture content is fulfilled with wood dried on air at least 12 months Fuel wood having moisture content to 20 max 25 minimum size bigger than a nozzle in refractory stone chamo...

Page 6: ...be placed on the boiler and within the minimum distances shown in Figure 1 Image 1 Minimum distance from the room walls valid for closest tank to the wall Cleaning and mainternance of the boiler Clea...

Page 7: ...tion principle the fuel burns out totally the cleaning of the boiler is limited to the upper and lower combusting chamber once in a week and the cleaning of flue gas tubes DC page 3 on the back side o...

Page 8: ...NEY Properly calibrated and built chimney is the precondition for a safe operation of the boiler and economic heating The chimney has to be good insulated gas proof and smooth On the lower part of the...

Page 9: ...air damper PZ page 3 for secondary and primary air if movable elements two lids of bottom openings of the flue gas chamber and flue gas tube cleaning lever Firing has to be performed according to the...

Page 10: ...pen central heating system one of possible way how to connect the boiler to the system is shown on Scheme 1 In case of Bio Tec boilers the boiler pump obligatory has to be connected to the boiler cont...

Page 11: ...e fuel the main switch of the boiler has to be turned on When the firing proces is over we can turn off the main switch but first it is necessary after the indication FUEL is turned on to wait that th...

Page 12: ...s are for ignition of the boiler from cold state without glow These measures should be implemented always when we don t have or don t have enough glow and when we will load the wood Technical manual B...

Page 13: ...ty in the system situated enough over the level of the highest radiator in the system and insulated if it is mounted outside of heated space if the mobile elements of the boiler are properly positione...

Page 14: ...exchanger 1 outer thread1 2 the arrow shows the direction fix the tube connected to the sewage outlet at the connecting point 3 outer thread1 2 Boiler regulation By pressing two buttons simultaneously...

Page 15: ...function to turn on off the regulator LED display shows the measured temperatures their ordinary number number or parameter value as well as the regulator functioning mode signal Indication START LED...

Page 16: ...possible to restart the procedure of the filling the combustion chamber First is need to push START button indication LED 3 is flashing see Point 7 0 open te upper boiler door and fill upper combustio...

Reviews: