![CentoLight PORTRAIT Q-Air Set User Manual Download Page 11](http://html1.mh-extra.com/html/centolight/portrait-q-air-set/portrait-q-air-set_user-manual_2581655011.webp)
11
11
PORTRAIT Q-AIR Set User Manual
Eng
2) Uplight Use
The PAR can sit on even and solid floor and work as an uplight. It also has a built-in
adjustable tilt support. By pushing the tile support, the fixture tile can move up to 25
degrees to wash walls or facades.
Make sure that the fixture is always placed on even and strong enough surface, and
keep it 0.5m away from projection objects.
3) Rigging
The PORTRAIT Q-AIR is equipped with a threaded M10 hole for a clamp. You can
then hang the fixture on a truss or other type of hanging structure. Please check the
light accessory lineup on
for further details.
When install the fixture to crossbar or truss, always use an extra safety cord (not
supplied with the fixture). Users also need to make sure the crossbar is stable or not
moving, and can support a weight of 36 kg (fixture net weight 3.6kg).
Pay attention to safety! Please respectively consider the EN 60598-2-17 and the
national standard during the installation. The authorized dealer must only carry
out the installation.
The installation of the fixture has to be built and constructed in a way that it can
hold 10 times the weight for 1 hour without any harming demolition. The installation
must always be secured with a secondary safety attachment, e.g. an appropriate
catch net. This secondary safety attachment must be constructed in a way that no
part of the installation can fall down if the main attachment fails.
When rigging, unmount or servicing the fixture, staying in the area below the
installation place, on bridges, under high working places and other endangered