19
Routine Maintenance
Routine Maintenance
A routine maintenance protocol is vital for the long-term operation of the vessels. For maintenance instructions for
MARS 6 instrument, see the MARS 6 iWave Manual (P/N 600832) or MARS 6 IR Manual (P/N 600284).
After Every Use
• Clean all vessel components. See “Cleaning and Inspection” section of this manual.
• Wipe inside of MARS cavity, including the sensors, with a lint free damp cloth.
• Inspect liners, plugs, caps and sleeves - See “Cleaning and Inspection” for acceptable wear on these
components.
As Needed
• Bake-out Procedure: See “Liner Bake-out Procedure” for detailed instructions. The bake out procedure can be
used to remove residual acid vapors and other trapped gases from the Teflon® material.
Annually
• Contact CEM Service Department, local CEM subsidiary or authorized dealer for information on CEM Service
contracts.