Routine Inspection Recommendations:
CellPath Ltd recommend that a simple annual inspection be made for all CellTec
laboratory equipment in order that any malfunction can be identified and rectified as
early as possible. This is to ensure user safety and prolong instrument life span.
Recommended checks to be made:
1. Condition of Power Lead.
A visual inspection to ensure the insulation is not damaged and that the correct fuse
is fitted.
2. Functioning of Heater On Lamp.
Heater lamp should be on when the instrument is warming up.
3. Functioning of Airflow Fans.
Both fans at the rear of the section dryer should operate. Both fans should begin to
operate as soon as the instrument is plugged into a power socket. Both fans should
spin freely with no indication of rubbing/friction.
4. Door Switch Operation.
Power to the heating elements should dis-engage as the door of the section dryer is
opened and re-engage when the door is closed.
Optional Equipment:
Part Number: JAX-0300-00B Product Description: LEAN Timer Unit - Four Slide
Racks
Part Number: JAX-0300-00C: Product Description: Slide Rack Holder/Identifier -
Four Slide Racks
CellTec Mini Section Dryer
15