Afet the power is switched on, the gun will blow air and the heating material will start heating.
3. Adjust the air-blow and the switch of the temperature control (see: Temperature Chart)
We suggest to adjust the temperature between 250-350°C. When the indicator flicks, it means the
temperature has reached the set. For air blow control, if it is single nozzle, you can set it at 1-3 shift and
other nozzle at 4-6 shift (But not blow the component off)
4. Install the puller under theIC (Integrated Circuit) unit.
If the with of the unit is not compliant with the size of the wire, you, depress the wire for installation.
5. Melt the soldering material
Hold the soldering head, aim at the soldering material. The hot air will melt the soldering material. Don't
touch the line of the IC with the nozzle.
6. Remove the IC
When the soldering material melted, remove the IC unit away.
7. Switch off the power
After you switch off the power, the auto air - blow function will be actuated. Cool air will be delivered
through the tube for cooling the heating material and the handle. So don't unplug the plug during this
time. If you don't use the machine for along time later, unplug the plug.
8. Removal the superabundant soldering material.
After removal of the integrated unit, the superabundant soldering material could be taken away by the
cleaner.
NOTE
: if it is SOP; PLCC, you can lift the integrated unit with a clip.
2.2. QPF soldering
1.
Coat with some soldering paste, and put the SMD on the circuit unit.
2.
Pre - heat the SMD.
3.
For soldering spray hot air to the line frame.
4.
After soldering, clean the superabundant soldering material.
WARNING
: To solder with hot air is effective. But it may cause soldering material ball of cause
connection of the material. We suggest you to check the soldering unit carefully.
3. Replace The Heating Material
1.
Release the screw and take out the heating unit. Release 3 screws in the handle (see fig. 1-1,2,3) and
release the heating material.
2.
Open the handle.
Release the termination of the ground connection (see fig. 2-1) and take out the tube. There is quartz
glass and isolation material inside. Don't drop them or get them lost.
3.
Take out the heating material.
Release the inserted termination (see fig. 2-2) and take out the heating material.
4.
Insert new heating material.
Install it carefully, don't scratch the heating material. Assemble the handle in reverse process when
open it. Insert the rise high part into the tube.
Summary of Contents for 909 series
Page 1: ...USER GUIDE FOR 909 Series...