background image

 

Parts List- See Section 1 

a.  1 Stainless Steel Table Top 
b.  4 Galvanized Legs (6 Legs for WT3-2496 and WT3-3096

 

c.  1 Galvanized Shelf 
d.  12 Stainless Steel Set Screws

18 Screws for WT3-2496 and  

WT3-3096

 

e.  1 Allen Key 

 

Assembly – See Section 2 

  Carefully remove all of the parts from the carton. 

  Place table top face down on level surface. 

  Insert each leg through each of the sockets on the table top. 

  Lower the galvanized under shelf over assembled table legs through holes 

provided on shelf.  Position the shelf at the marked line which is 6” from 
the bottom of legs).  Use the set screws to fix the shelf to legs. 

  Use set screws to fix legs to table top. 

  Adjust the legs so that they are level and firmly located in each socket.  

Tighten all screws on table top and the corner of galvanized under shelf. 

  Turn the table over and set it upright.  If there is any movement in the 

table, the feet can be used to make adjustment and level the table ready 
for use. 

  Before using the table, we recommend that you clean it thoroughly using a 

cleaning agent recommended for stainless steel, ensuring all cleaning 
agents and moisture are removed from the table top before use. 

 

Care of the Table 

  Clean the table regularly as required, using a cleaning agent 

recommended for stainless steel and galvanized surfaces. 

  Always clean off any cleaning solution residue, as failure to do so may 

cause discolouring and marks to develop. 

  Never leave any surface with water or damp areas, as this may cause 

discolouration. 

 

Warning 

  Whilst Cecilware attempts to remove all sharp edges, care must be taken 

when cleaning or handling the table to prevent the risk of injury from 
exposed metal edges. 

  Do not overload the table causing the top or shelf to bend. 

 

Cecilware Corporation 

43-05 20

th

 Avenue 

Long Island City, NY 11105 

Tel:  800-935-2211 
Fax: 718-932-7860 

www.cecilwarephotos.com 

Reviews: