START-UP PROCEDURE 

 
Caution:   Make sure that the Heater Switches, are in the OFF position. 
 

 

1.  Connect the 

¼ 

inch

 

copper waterlines to the 

¼ 

inch flare water inlet fittings of the valves. 

2.  Plug the power cords into dedicated receptacles. 
3.  Activate the 

Power Switch

 (Toggle Up). The door display panel, the red power indicator lights 

and the green dispense buttons will light up and the

 

tanks will start filling. Allow approximately

 

4-5 minutes for the tanks to fill. 

4.  Activate the 

Heater Switch

. Allow approximately 10-30 minutes for the water to reach the 

proper dispensing temperature of 190° F. The heat up time will depend on the water inlet 
temperature, the input voltage and the wattage of the elements in the water tanks. 

5.  Place a

 

cup under the dispense nozzle, press and hold the dispense switch for 6 seconds. The unit 

will dispense water at the rate of 1 oz. per second. Repeat it several times to check for consistent 
output.  Repeat same for the other dispense switches. This procedure checks that the dispense 
valves are not “air-locked.”   

6.  While the water tanks are heating up, the 

heater light

 comes on. Remove the hoppers, load them 

with product and reposition them back in place. When the 

heater light

 turns off, the water tanks 

have reached their proper temperature and are ready to dispense the first cup of Cappuccino

 
 

 

TO DIPENSE A CUP OF CAPPUCCINO: 

 

Place a cup under the selected drink dispense nozzle. 

 

Push and hold dispense button until cup is 2/3 full, then release button.

 

 

 

 

            
      

Summary of Contents for panorama GB6MP-10-LD-U

Page 1: ...GB5MV 10 LD Operation Manual NL48P July 2005 GB6MP 10 LD U GB8MP 10 LD U...

Page 2: ..._____________________________________6 Recommended Cleaning and Sanitizing_____________________________7 Dual Probe Liquid Level Controller______________________________8 Components Tests_____________...

Page 3: ...over 50 different models to choose from With the introduction of Cecilware GB5MV 10 LD GB6MP 10 LD U GB8MP 10 LD U designed exclusively to fit the increasing demand for Cappuccino sales the hot bever...

Page 4: ...user serviceable parts To avoid damage to the unit or injury to personnel use only Authorized Cecilware Service Agents and Genuine Cecilware Parts when service is required Genuine Cecilware Replaceme...

Page 5: ...design its 27 inch footprint left to right allows maximum utilization of counter space SPECIFICATIONS ELECTRICAL RATING CHART Model Voltage Watts Amps Circuit Breaker Shipping Weight GB5MV 10 LD 1 x...

Page 6: ...art up operation of the machine or whenever the tank is being drained for service 4 POWER SWITCHES See diagrams inside this manual for the location of power switches for each individual model They con...

Page 7: ...mperature the input voltage and the wattage of the elements in the water tanks 5 Place a cup under the dispense nozzle press and hold the dispense switch for 6 seconds The unit will dispense water at...

Page 8: ...Dispense Button is pressed F Faulty Coupling Replace damaged Coupling components A Leaking Water Inlet Valve Clean check Water Inlet Valve fittings Replace Water Inlet Valve if needed B Inoperative D...

Page 9: ...Probe detects the absence of water the Controller immediately turns ON and the Low Level Probe is allowed to control the Fill Valve When the High Level Probe detects the presence of water for 1 5 sec...

Page 10: ...E TRAY BY PULLING LEVERS DOWN REMOVE O RINGS TWIST OFF WHIPPER CHAMBER MOUNTS CLOCKWISE PULL OFF WHIPPER BLADES TWIST OFF WHIPPING CHAMBERS CLOCKWISE REMOVE PRODUCT TUBES BY PULLING DOWN REMOVE MIXING...

Page 11: ......

Page 12: ...ISTA 5 Flavor Cappuccino Dispenser Door not shown PRODUCT GUIDE DRIP TRAY PAN POWER SWITCH RINSE SWITCH GRILL HOPPER 4 CD185 5 Lbs 5 Lbs 5 Lbs HEATER SWITCH WHIPPER CHAMBER HOPPER 1 CD179 HEATER LIGHT...

Page 13: ...ER POWER SWITCH PRODUCT GUIDE HEATER LIGHT POWER SWITCH RINSE SWITCH RIGHT SIDE HOT WATER OPTIONAL HEATER LIGHT POWER SWITCH RINSE SWITCH LEFT SIDE GB8M 10 LD U GB8MP 10 LD U 8 Flavor Cappuccino Dispe...

Page 14: ...BELOW ARE NOT INTERCHANGEABLE WITH STANDARD STRAIGHT WHIPPER CHAMBERS BE SURE TO ORDER USING THE CORRECT PART NUMBERS SLANTED WHIPPER CHAMBER MARKING 1 2 2 1 1 4 1 2 1 1 1 1 11 2 12 1 ITEM IMPELLER 1...

Page 15: ...PRODUCT GUIDE SHORT AUGER BUSHING FRONT CD306 CD70A AGITATOR WHEEL W SPRINGS AUGER BUSHING BACK CD279 BEVELLED SOCKET CD271 NUT CD278 2 HOPPER BASE CD140 HOPPER COVER AUGER MOTOR CD175 90 RPM...

Page 16: ...PRODUCT GUIDE SHORT AUGER BUSHING FRONT CD306 CD70A AGITATOR WHEEL W SPRINGS AUGER BUSHING BACK CD279 BEVELLED SOCKET CD271 NUT CD278 2 HOPPER BASE CD140 AUGER MOTOR CD175 90 RPM HOPPER COVER...

Page 17: ...BODY ASS Y GB5MV 10 LD Vista DESCRIPTION ITEM QTY P N...

Page 18: ...DOOR ASS Y GB5MV 10 LD Vista DESCRIPTION ITEM QTY P N...

Page 19: ......

Page 20: ...ING UPPER 4 SK50A 1 SK44A 1 DOOR HOUSING LOWER 5 M903A 1 M915A 1 MOLDED UPPER DOOR PANEL 6 M904A 1 M916A 1 MOLDED LOWER DOOR PA NEL NN13A 1 NN52A 1 SWITCH PANEL LABEL F MOLDED LOWER DOOR 7 L455A 6 L45...

Page 21: ...DESCRIPTION ITEM QTY P N...

Page 22: ...DESCRIPTION ITEM QTY P N TANK DIMENSIONS 12 WIDE 4 8 DEEP 16 5 HIGH APPROX 3 7 GAL...

Page 23: ...DESCRIPTION ITEM QTY P N TANK DIMENSIONS 15 WIDE 6 DEEP 18 HIGH APPROX 6 GAL...

Page 24: ...WITCH A2 44NO 32NC 22NC 14NO A1 43NO 31NC 21NC 13NO GND 5 15P 15A 1 7KW 5 15R POWER SWITCH L1 GND GND TANK HEATER 1 7KW L1 N RELAY L1 L1 FAN G W W G CONTACTOR RELAY RELAY RELAY RELAY AUGER AUGER AUGER...

Page 25: ...GB6M 10 LD U...

Page 26: ...GB8M 10 LD U GB8M10WLD ELECTRICAL DIAGRAM LEFT SIDE 120V NE195 SHEET 1 OF 2 WATER LEVEL PROBES LIQUID LEVEL CONTROL WATER DISPLAY LIGHTS REV A...

Page 27: ...GB8M 10 LD U GB8M10WLD ELECTRICAL DIAGRAM RIGHT SIDE 120V NE195 SHEET 2 OF 2 WATER LEVEL PROBES LIQUID LEVEL CONTROL WATER DISPLAY LIGHT REV A...

Reviews: