Refer to drawing and reel in sealing (teflon) tape on thethreading
part of provided two stop walves (taping it 8~12 times)
Secure upper & lower holes for screw bolt and make
hole on 6 points of ‘A’ (use spirit level)
( 6.5mm drill bit, depth: 50mm)
make hole on 6 points of ‘A’
make hole on 6 points of ‘A’
1) Unlock the stop valves with using flat-head screw driver (un-clockwise) and
allow the water come out for a while to remove any dust in the valves.
2) After removing any dust in the valves, lock them again
It attects water flow if there is dust in the valves