![Ceado E5P Use And Maintenance Manual Download Page 28](http://html1.mh-extra.com/html/ceado/e5p/e5p_use-and-maintenance-manual_2577278028.webp)
INSTALLATION
Comply with the
safety recommendations
indicated above and hereafter when installing the
appliance.
For the installation of the appliance, qualified personnel must be present who are able to check the
fineness of the grind.
1. Make sure that the mains voltage is as indicated on the rating label of the appliance and that
the electrical system is grounded and equipped with a switch.
2. Install the appliance in a
DRY, PROTECTED place
, far from water sprays and jets, heat
sources, open flames and inflammable substances.
Place the appliance on a
flat, horizontal, stable surface
where it cannot tip over.
3. Put the tray in its housing to keep the work area as clean as possible.
Before connecting the plug to the power socket, make sure that the ON-OFF switch
(8 Fig. 1) is in position “0” (OFF).
4. Plug the power cable into a socket protected by a suitably rated circuit breaker (MCB) or fuses.
Do not use an adaptor plug.
5. Stretch the power cable out to full length.
Do not
let it pass over sharp edges or hot surfaces.
Do not
let oil spill on it.
Do not
let the power cable hang loose from the counter on which the
appliance stands.
6. Make sure that the bean hopper is correctly positioned and that its shutter (7 Fig. 5) is
completely open (to the last click).
The EC declaration of conformity for this appliance is available in the
Products
section of our
website
www.ceado.com
.
28
GB
Summary of Contents for E5P
Page 14: ...14 I 3 7 6 4 Fig 11 Barra del tempo 3 secondi 4 0 7 0 0001 Time...
Page 34: ...34 GB 3 7 6 4 Fig 11 Time bar 3 seconds 4 0 7 0 0001 Time...
Page 54: ...54 F 3 7 6 4 Fig 11 Barre du temps 3 secondes 4 0 7 0 0001 Time...
Page 74: ...74 D 3 7 6 4 Abb 11 Zeitleiste 3 Sekunden 4 0 7 0 0001 Time...
Page 94: ...94 E 3 7 6 4 Fig 11 Barra del tiempo 3 segundos 4 0 7 0 0001 Time...