CE-2500-HVE Band Sealer
Page 10
6.3.
Sealing Belt Adjustment / Replacement
6.3.1.
Remove the safety cover, after the heating blocks cool, turn stopping flakes on both upper
heating block and upper cooling block by 90° to lift both, then loosen the springs on both
embossing roller and pinch roller, meanwhile, remove the guiding belt, to prepare it for
removing sealing belts. (see Diagram 6.2)
6.3.2.
Move the driven wheel seat (adjusting block) towards heating block and remove the
sealing belt.
6.3.3.
Replace with a new sealing belt and install the guiding belt back.
6.3.4.
Put the driven wheel, heating/cooling blocks, and pinch roller to the original position.
6.3.5.
Connect to the power supply to test the machine. If irregular sealing appears on the belt,
make adjustment by adjusting screws on the driven wheel seat (adjusting block)( see
Diagram 6.3).
6.3.6.
Install the safety cover. When the temperature reaches the set temperature, the machine
is ready.
Diagram 6.2
1 101347 Bolt
2 101348 Withdraw Stopping Flake
3 101345 Tightening Bolt
4 101345 Tightening Bolt
1
1
1
1
2
2
3
3
4
4
Summary of Contents for CE-2500-HVE
Page 9: ...CE 2500 HVE Band Sealer Page 8 Diagram 5 3...
Page 16: ...CE 2500 HVE Band Sealer Page 15 Step 7 Step 8 Step 9 Step 10 Step 11 Step 12...
Page 17: ...CE 2500 HVE Band Sealer Page 16 Step 13...
Page 18: ...CE 2500 HVE Band Sealer Page 17 VIII Stand Assembly Included Parts Assemblied Stand...
Page 22: ...CE 2500 HVE Band Sealer Page 21 X Sealing Unit Parts List Diagram 10 1...
Page 24: ...CE 2500 HVE Band Sealer Page 23 XI Conveyer Parts List Diagram 11 1 18 19 20 18...
Page 26: ...CE 2500 HVE Band Sealer Page 25 XII Component Parts List Diagram 12 1...
Page 28: ...CE 2500 HVE Band Sealer Page 27 XIII Conveyor Table Parts List Diagram 13 1...