CDL 81125V User Manual Download Page 2

 

Operating cycles  

Shutdown procedure 

1) Drain liquid from the wash tank 
2) Loosen drain cap from filter housing. Remove filter cartridge from housing 
3) Open all drain valves, sampling valves and concentration valves V1 to V10. 
4) Disconnect suction hose and drain water out of it. 
5) Unfasten and drain strainer housing at pressure pump inlet. Leave it off 
6) Press and hold green start button for

 2 seconds. This operation will allow to flush residual water from the pump.

 

7) Repeat step 6 twice at 10 seconds intervals. 
8) Disconnect electrical plug. 

 
 

Reviews: