Installation Preparation:

Before installing a new tap it is essential that you thoroughly flush through the supply pipes in order to remove any 
remaining solder, swarf or impurities from your system. Failure to carry out this simple procedure could cause problems 
or damage to the internal components of the tap.

We strongly recommend installing particle filter strainers and isolation valves to both the hot and cold feed pipes in an 
accessible position. This will help to prevent premature failure of the valves and ease any future maintenance.

All parts should be removed from their packaging and inspected for any transport damage prior to installation.

Turn off and drain the water supply to the sink, unless there are isolation valves fitted.

This tap requires a 35mm

ø

 tap hole.  If replacing an existing tap, remove the tap and clean the end of the feed pipes using 

wire wool the tap hole area should be free from dirt and sealant. Loosely position the tap and tail pipes to check if any 
alteration to the existing pipework is required, if this is the case do this now.

Installation: 

After installation:

Once you have visually checked the new fittings and connections, turn the water 
supply back on and check all fittings carefully for leaks.  Then turn the tap back on 
and check there are no leaks from the body or valve area.

Clean the tap to remove any marks created during installation as instructed then 
replace the bag that has been provided to protect the tap until it is ready for use.

 

TV5CH  Contemporary side single 

lever tap

KEY

DESCRIPTION

QUANTITY

A

Tap body

1

B

Upper sink/worktop seal

1

C

Horseshoe washer

1

D

Horseshoe washer

1

E

Studded rod

1

F

Fixing nut

1

G

Inlet pipe (offset)

1

H

Inlet pipe

1