CDA TV11 Quick Start Manual Download Page 2

 

Installation

 

 
1.  Screw studded rods (C) into the base of the tap (A). 

 

2.  Place the upper seal (B) onto the bottom of the tap (A). 

 

3.  Screw the hot & cold water tail pipes (H & I) into the base of the tap (A) as shown. 

 

4.  Place the mixertap (A) onto the sink/worktop, passing the tail pipes (H & I) and studded rods (C) through the tap hole  

 

5.  Pass the triangular stabiliser (D), lower gasket (E) and then the fixing bracket (F) over the studded rods (C) and around the flexible 

tail pipes (H & I) 

 

6.  Fasten the fixing nuts (G) securely onto the fixing studs (C) to fix the tap (A) into its correct location. 

 

7.  Connect the hot and cold tail pipes (H, I) to the non-return valves (J) noting the direction of the flow arrow. 

 

8.  Connect the non-return valves (J) to the water supply using compression nuts and olives (L, K). 

 

 

 

 

Key 

Description 

Qty 

 

Mixertap body 

 

Upper seal 

 

Fixing studs 

 

Triangular stabilising bracket 

 

Lower gasket 

 

Fixing bracket 

 

Fixing nuts 

 

Hot Flexi tail 

 

Hot Flexi tail 

 

None return valve 

 

Compression olives 

 

Compression nuts 

 

 

 

After installation: 

 
Once you have visually checked the new fittings and connections, ensure that all taps are closed except the new mixer tap, which should be 
left open. Turn on the water supply at the mains stop cock. As the system starts to refill, 

check carefully for leaks

. Once you are fully 

satisfied that there are no leaks, turn on the water heating.  
 
Clean the tap to remove any marks created during installation as instructed then replace the bag that has been provided to protect the tap 
until it is ready for use.

 

Reviews: