CDA TC57 Installation Instructions Download Page 2

 

Installation:

 

 

1.  Screw in the studded rod (D) into the base of the tap (A). 

 

2.  Place the base plinth (B) then upper seal (C) onto the base of the tap (A). 

 

3.  Screw the hot & cold water tail pipes (H) into the base of the tap. 

 

4.  Place the mixertap (A) onto the sink or worktop, pass the tail pipes (H) and studded rod (D) through the taphole. 

 

5.  Pass the rubber and then metal horseshoe (E&F) over the studded rod (D) and around the tail pipes. 

 

6.  Fasten the fixing nut (G) securely onto the fixing stud (D)  to fix the tap into its correct location. 

 

7.  Connect the hot and cold tail pipes (H) to the water mains using a ½” BSPx15mm compression fittings. 

 
 

 

Key: Description: 

Qty   

A Mixertap 

body 

1  

B Base 

plinth 

1  

C Upper 

seal 

1  

D Fixing 

stud 

1  

E Rubber 

horseshoe 

1  

F Metal 

horseshoe 

1  

G Fixing 

nut 

1  

Hot & cold flexible tail pipes 

 

 

 

 

 

 

After installation: 

 
Once you have visually checked the new fittings and connections, ensure that all taps are closed except the new mixer tap, which should be 
left open. Turn on the water supply at the mains stop cock. As the system starts to refill, 

check carefully for leaks

. Once you are fully 

satisfied that there are no leaks, turn on the water heating.  
 
Clean the tap to remove any marks created during installation as instructed then replace the bag that has been provided to protect the tap 
until it is ready for use.

 

 

Reviews: