CDA TC56 Installation Instructions Download Page 2

 

Installation: 

 

Key: Description: 

Qty   

A Mixertap 

body 

 

B Base 

plinth 

 

C Upper 

seal 

 

Hollow fixing stud 

 

White triangular stabilizer  
(for stainless steel sinks only) 

 

F Rubber 

horseshoe 

 

G Metal 

horseshoe 

 

H Fixing 

nut 

 

I Fibre 

washer 

 

J Nylon 

hose 

 

K Hose 

weight 

 

L Hose 

weight 

screws 

 

Hot rigid tail pipe 

 

Cold rigid tail pipe 

 

O Compression 

nuts 

 

P Compression 

olive 

 

Non return valve 

 

 

 

 

 

1.  Screw in the fixing stud (D) into the base of the tap (A). 
 
2.  Place the base plinth (B) then upper seal (C) onto the 

base of the tap (A). 

 

3.  Screw the hot & cold water tail pipes (M&N) into the 

base of the tap. 

 

4.  Place the mixertap (A) onto the sink or worktop, pass 

the tail pipes (M&N), nylon hose (J) and fixing stud (D) 
through the taphole. With the tap in place check that the 
tail pipes (M&N) meet the hot and cold water feeds. If 
further adjustment to the plumbing is required do this 
now. Note: the tail pipes can be carefully bent apart to 
allow more space for fittings to be attached and the 
nylon hose (J) to move freely. 

 

5.  Pass the rubber and then metal horseshoe (F&G) over 

the fixing stud (D) and around the tail pipes (M&N) and 
nylon hose (J). If fitting the tap to a stainless steel sink 
the white triangular stabilizer (E) can be placed where 
shown to help to stabilize the weight of the tap. 

 

6.  Place the fibre washer (I) in the end of nylon hose (J) 

and tighten the nylon hose (J) onto the hollow fixing 
stud (D). Note ensure the hose is not twisted and has 
free space in the cabinet to move. 

 

7.  Fasten the hose weight (K) around the lowest point of 

the nylon hose (J) using hose weight screws (L). 

 

8.  Connect the hot tail pipe (M) to the water supply using a 

½” BSPx15mm compression fitting. 

 

9.  Connect the Non return valve (Q) to the cold water tail 

pipe (N) using compression nut & olive (O&P). 

 

10.  Connect the Non return valve (H) to the cold water 

supply using compression nut & olive (O&P). 

 

 

After installation: 

 
Once you have visually checked the new fittings and connections, ensure that all taps are closed except the new mixer tap, which should be 
left open. Turn on the water supply at the mains stop cock. As the system starts to refill, 

check carefully for leaks

. Once you are fully 

satisfied that there are no leaks, turn on the water heating.  
Clean the tap to remove any marks created during installation as instructed then replace the bag that has been provided to protect the tap 
until it is ready for use.

 

Reviews: