background image

AVS-010-INST - C  AUG 2013

Summary of Contents for AVS-010-INST - C

Page 1: ...AVS 010 INST C AUG 2013 ...

Page 2: ... Mount Dual Screen Mount Column Codec Bracket Camera Mount End Caps Spare Fixings 2 x Velcro Fasteners 6 x Buttons Shelf Optional x1 x1 x4 AVS 010 K01 AVS 010 K02 x4 x4 x2 Screen Mount x1 Extension Brackets x2 Screen Mount x2 Extension Brackets x4 Allen Keys x2 Screen Mounts x2 ...

Page 3: ...BALANCE LEVEL S O M E I M P O R T A N T P R E C A U T I O N S ...

Page 4: ...designed Ensure that floor or wall surface is strong enough to support the weight of the fully loaded VCALL and that the floor surface is flat and level Do not install VCALL outdoors or in environments where it will be directly exposed to moisture or highwinds Follow the manufacturer s guidance for mounting of monitors displays and other equipment Please take care to avoid trapping fingers when in...

Page 5: ... 3 i i i i i Insert End Caps v Insert End Caps Fit M5 screws to Dual screen mounting frame as shown Fit screen mounting frame to beam brackets Fit screen mounting frame to beam brackets i i i v i i i Align using centre line mark i i Fit 8 x M5 screws and tighten Fit 8 x M5 screws and tighten Unless panel needs to be removed leave zip tie in place during installation ...

Page 6: ...R E M O V E T H E B A C K P A N E L 4 I N S T A L L T H E C A M E R A M O U N T A R M 6 I N S T A L L T H E C A M E R A M O U N T P L A T F O R M 7 I N S T A L L C O D E C M O U N T 5 ...

Page 7: ... 9 H A N G S C R E E N D I R E C T L Y O N T O M O U N T I N G F R A M E 1 0 I N S T A L L C O M P L E T E D C A M E R A M O U N T A S S E M B LY B Y P L A C I N G O N T H E S C R E E N M O U N T 8 3 Per screen x4 x4 2 people required to mount screens ...

Page 8: ...R S C R E E N A P P L I C A T I O N 1 1 S E C U R E S C R E E N B R A C K E T S I N P L A C E 1 2 Clockwise to adjust downwards from bracket Anti Clockwise to adjust upwards from bracket If screens are not aligned vertically adjust as required with 4mm Allen key ...

Page 9: ...ed cables out through the front of the unit 1 A Cut velcro wraps to required length 3 A Release channel 2 A Pass cable through holes in base 4 A Feed cables through channel Ensure channel locates 2 B 2 C Use velcro wraps to attach to crossbar 3 B Use velcro to stick wraps to side of columns 3 C Pull cables clear of the base 4 B Clip cables into management clip underneath base to secure 4 C click ...

Page 10: ...C L O S E T H E B A C K P A N E L 1 4 I N S T A L L A T I O N C O M P L E T E ...

Page 11: ...F I T T I N G T H E O P T I O N A L S H E L F 1 5 i Pick the required height i i Tilt and insert shelf into relevant slot ...

Reviews: