![CBS ArcSafe RSK-SACE2 User Manual Download Page 4](http://html1.mh-extra.com/html/cbs-arcsafe/rsk-sace2/rsk-sace2_user-manual_2575621004.webp)
CBSArcSafe.com
|
Email: [email protected]
A Group CBS Company
CBS
Safe
®
Arc
5. Turn the Power Switch on top the controller to the ON
position. The amber LED should illuminate indicating
the unit is ready.
6. When ready to operate actuator, press and hold the
ENABLE button while depressing either the OFF or
ON button for the desired operation. Both buttons
must be held depressed until the actuator has fully
depressed the buttons.
7. Release the ENABLE and OFF or ON buttons and the
actuator will retract.
4.3 Actuator Mounting Bracket
Use of the RSK-SACE2 Chicken Switch actuator will require
the installation of a mounting bracket on the face of your
breaker. These brackets are attached to the breaker using
industrial strength double sided adhesive manufactured
by 3M. Each breaker that the RSK-SACE2 is intended to be
used on will require one of these brackets installed. Each
RSK-SACE2 comes with two mounting brackets. Additional
brackets can be purchased from MarTek by calling 1-800-
248-4958. Order Part Number P-0209.
Below is a picture of a bracket installed on the breaker.
Detailed instructions for installing the bracket will be
included with the bracket.
4.4 Actuator Mounting Bracket
The slot on the bottom of the RSK-SACE2 actuator must be
aligned over the mounting bracket.
STEP 1:
Verify that both linear actuators are fully
retracted into the actuator base. Note that if the actuators
are not fully retracted, you will not be able to install the
actuator on the breaker.
STEP 2:
Align the RSK-SACE2 actuator slot over the
bracket so that it engages the slots on the bracket.
STEP 3:
The RSK-SACE2 actuator should engage the
mounting bracket and go flush against the breaker face.