background image

 

RSA-184D 
Installation and Operation

 

8

 

 

 

7.

 

Place the arm of the spare switch in the ON position. 

 

8.

 

Rotate the motor arm by hand to match the switch arm. 

 

9.

 

Slide the upper hard stop to contact the arm at that position. 

 

10.

 

Tighten the hard stop bolt. 
 

11.

 

Repeat with the switch in the off position using the lower hard stop. 

 

 

Summary of Contents for RSA-184D

Page 1: ...e United States of America Reproduction adaptation or translation without prior written permission is prohibited except as is allowed by law RSA 184D Installation and Operation 2616 Sirius Road Denton TX 76208 877 4 SAFETY www cbsarcsafe com For Cutler Hammer Westinghouse Horizontal FDPW 400A Single Rev 4 26 2019 Distanceis Safety WE DO WHAT STANDS BETWEEN YOU AND ARC FLASH DANGER ...

Page 2: ...ly install and remove a particular type of circuit breaker safely while stationed safely outside of the arc flash boundary during the potentially dangerous operation The lightweight and compact design of the RRS 3 systems makes them ideal for hard to access areas where space is at a premium RRS 4 PLC Based Universal Remote Racking System Rotary The CBS ArcSafe RRS 4 universal remote racking system...

Page 3: ...placards may interfere with the proper installation of the RSA Please remove or reposition these items before installing the RSA 1 Ensure that the switch is free from any obstruction that may interfere with the proper installation of the RSA 184F 2 Note the position of the switch handle and manually position the motor arm of the RSA 184F to match 3 Place the RSA 184F on the face of the switch ensu...

Page 4: ...RSA 184D Installation and Operation 4 4 Secure the RSA 184F to the switch by turning the handles of the two magnets 180 degrees clockwise 5 The RSA 184F is ready for remote operations ...

Page 5: ...tions on the operation of the RSO I AR please see the RSO I AR Manual 1 Ensure that the RSA is properly installed See the Installation section for detailed instruc tions 2 Plug the RSO I AR into the motor control box 3 Exit the arc flash boundary 4 Turn the power switch on the RSO I AR to the ON position 5 Ensure that the Auto Retract AR function is set according to the placard on the RSA If not s...

Page 6: ...s do need to be performed it is recommended that they be done on de energized and isolated equipment to prevent possible damage or injury 3 1 Motor Adjustment The motor can be repositioned vertically to ensure a proper fit over the switch arm 1 Loosen the four bolts securing the motor bracket to the frame 2 Slide the motor bracket up or down to position the motor arm 3 Re tighten the four bolts ...

Page 7: ...switch 1 Loosen or remove the bolts on the magnet to be adjusted 2 Reposition the magnet as necessary 3 Re insert and re tighten the bolts to secure the magnet 3 3 Hard Stop Adjustment The hard stops on the RSA 184F may need adjustment to ensure that the motor does not over rotate and damage the switch 6 Loosen the bolts holding the hard stops to the frame ...

Page 8: ... the spare switch in the ON position 8 Rotate the motor arm by hand to match the switch arm 9 Slide the upper hard stop to contact the arm at that position 10 Tighten the hard stop bolt 11 Repeat with the switch in the off position using the lower hard stop ...

Page 9: ...RSA 184D Installation and Operation 9 Notes ...

Page 10: ...RSA 184D Installation and Operation 10 Notes ...

Page 11: ......

Page 12: ... that they are correctly stationed outside the arc flash boundary and that they comply with all applicable Federal State Local and In house safety regulations and procedures Attention should be given to distance angle and person al protective equipment PPE 2616 Sirius Road Denton TX 76208 Tel 877 4 SAFETY Fax 940 382 9435 Website www CBSArcSafe com Email info CBSArcSafe com ...

Reviews: