CBI Astute
Instruction Manual
Page 4
3990A963 REV B
Installation - Astute Smart Isolator (ASI)
1.
This device must be installed by a qualified electrician
2.
Isolate supply before installing the ASI
3.
Install the ASI in the outlet box
4.
Connect the ASI according to Figure 5. Observe markings for line
and load terminals.
5.
To power the ASI press the isolation switch to ON (refer to
Figure 6). Once power is ON the LED will light up.
6.
Download and install the CBI Home App from either the App Store
or on Google Play
Figure 5: ASI installation
LED (BLUE / RED)
POWER BUTTON
ISOLATION SWITCH
Figure 6: ASI front face
Isolation Switch -
Turn off isolation switch to isolate the
load. Always turn off isolation switch before performing
an insulation resistance test on the installation.
Turning
the isolation switch off for 1 second will reboot the ASI.
PLEASE NOTE:
Line and load cannot be
reversed. If reversed the
device will not power up.
TERMINALS