![CBE PC180-ST User Manual Download Page 11](http://html.mh-extra.com/html/cbe/pc180-st/pc180-st_user-manual_2575492011.webp)
MAIN PARTS OF THE ELECTRICAL SYSTEM
>
“PC180-ST”
CONTROL PANEL
- mains’ control, battery test, tank test.
> 12V DISTRIBUTION BOX “DS3 0-ST”
0
- main relais, battery parallel relais (12V - 70A), fridge relais, pump
relais, car battery recharging device, protection fuses.
> TANK PROBE WITH SCREWS “SS/P” - signalization of full waste water tank.
> 4-RODS TANKPROBE - it measures the content of the
water tank, 4-levels visualization
fresh
.
> CAR BATTERY “B1”.
> LEISURE BATTERY “B2” - it gives power to all the users.
ADVICE AND CHECKS
BATTERIES
Read with care the instructions of use and
maintenance of the batteries.
The acid kept in the batteries is poisoning and
corrosive. Avoid any contact with skin and eyes.
If the battery is completely discharged it needs
recharging for almost 10 hours. If discharged for
more than 8 weeks it may be damaged.
Check the correct tightening of the connection
binding screw and brush off the oxyde.
If the leisure battery is removed, isolate the positive
pole (in order to avoid short-circuits during an
accidental car engine starting).
In case of a longer stop, the services battery has to
be disconnected or recharged regularly.
BATTERY CHARGER
The battery charger must be installed in a dry and
ventilated place.
The installation of this device must be carried out by
specialized technicians.
Check periodically the level of the liquid of the
battery (with acid); the GEL battery does not need
any maintenance but a countinuous recharging.
In case of battery charger’s misuse, the guarantee
falls off and the manufacturer declines all
responsibility for damages to people and things.
Do not carry out any maintenance when the battery
charger is connected to the 230V power supply net.
Do not cover air intakes and assure an appropriate
ventilation.
Before disconnecting the battery charger from 230V
power supply, turn the security switch off.
Replace the fuses after finding out the real cause of
the damage only.
Connect and disconnect the external 230V net only
when the main switch is off.
230V CUT-OUT BOX
When the fuses are replaced respect the value of the
amperage established.
TANK PROBES
Never let water in the tanks for long time, in order to
avoid foulings, especially in the waste water tank.
In case of automatic switch break, find the damage
before giving power again to the electrical system.
In order to cut power to the whole 230V system,
please take care that the 230V main switch must be
on the “0” (OFF) position.
In order to avoid damages to the box, check the
correct tightening of the connections.
Before taking away the cover, check that the 230V
socket is disconnected.
FUSES
IMPORTANT Maintenance interventions on the electric implant must be carried out by
specialized personnel. Before carrying out maintenances disconnect the battery and the
230V alimentation line.
:
EN
11
Summary of Contents for PC180-ST
Page 2: ......
Page 29: ...29 INSTALLATION PC180 ST ...
Page 30: ...WIRING DIAGRAM PC180 ST 5A 10A 20A 20A 20A 25A 3A 30A 10A 3A 30 PTC ...
Page 31: ...31 NOTE ...