230 Series Auger Packer
36 OF 115
CHANGING THE ISOLATOR SEAL ON AN EXISTING NON-INFLUENCING SPOUT ASSEMBLY
Locate the out spout tip wire retainer
When you find the wire retainer, take a pliers and pull wire completely out
Now remove the outer tip by turning back and forth gently and pulling at the same time to remover tip.
Locate the nuts to take the outer spout off and remove 4 nuts, removing outer spout.
Locate the wire retainer in the inner spout retainer ring.
Remove inner spout retainer wire completely
Slide the inner spout retainer ring back just so it clears the seal and remove old isolator seal.
Install new seal on inner spout
Put liquid hand soap on your finger and run your finger all the way around the back edge of the new
inner seal, to help the inner ring slides up over the seal easier.
Slide the inner retainer ring back in position aligning up the wire groove on the ring and the inner spout.
Put a few drops of soap in the groove and take a new retainer wire and start it in the groove.
Install retainer wire in until you see it coming out the other side. Stop pushing the wire in and pull back til
wire disappears on the other side.
Clip the wire as close as you can on this side.
Take your pliers or a pointy tool and push the end you just clipped off back in under the retainer ring.
There should be no wire exposed.
Reinstall outer spout with 4 nuts (do not tighten- just snug)
Check the alignment between the two spouts. You must verify that the spouts are centered on each other
and that there is clearance all the way around them. Once you believe you have them aligned you may
ensure proper clearance by taking a wire to the gap between them and running it all the way around.
This will ensure there is sufficient clearance.
If you don’t have clearance and need to adjust the spout, try to move the outer spout. If the nuts are too
tight, loosen the 4 nuts, just enough that you can move it. Move it the direction required and retighten
nuts. Recheck alignment and redo until you have clearance.
Once proper clearance between the two spouts has been established, take the seal and roll it over onto
the outer spout.
Summary of Contents for 230
Page 12: ...230 Series Auger Packer 12 OF 115 CHAPTER 1 RECEIPT OF EQUIPMENT ...
Page 15: ...230 Series Auger Packer 15 OF 115 CHAPTER 2 INSTALLATION ...
Page 18: ...230 Series Auger Packer 18 OF 115 CHAPTER 3 OPERATION ...
Page 21: ...230 Series Auger Packer 21 OF 115 CHAPTER 4 COMPONENT DESCRIPTION ...
Page 27: ...230 Series Auger Packer 27 OF 115 CHAPTER 5 Startup Instructions Adjustments ...
Page 34: ...230 Series Auger Packer 34 OF 115 CHAPTER 6 Non Influencing Fill Spout ...
Page 38: ...230 Series Auger Packer 38 OF 115 CHAPTER 7 PLC TIMER ADJUSTMENTS ...
Page 41: ...230 Series Auger Packer 41 OF 115 CHAPTER 8 MAINTENANCE ...
Page 47: ...230 Series Auger Packer 47 OF 115 CHAPTER 9 TROUBLESHOOTING ...
Page 53: ...230 Series Auger Packer 53 OF 115 ILLUSTRATED PARTS ...
Page 55: ...230 Series Auger Packer 55 OF 115 ...
Page 56: ...230 Series Auger Packer 56 OF 115 ...
Page 64: ...230 Series Auger Packer 64 OF 115 ...
Page 65: ...230 Series Auger Packer 65 OF 115 ...
Page 66: ...230 Series Auger Packer 66 OF 115 ...
Page 67: ...230 Series Auger Packer 67 OF 115 CHAPTER 10 WEIGH CONTROLLER ADJUSTMENTS ...
Page 75: ...230 Series Auger Packer 75 OF 115 ...
Page 76: ...230 Series Auger Packer 76 OF 115 ...
Page 77: ...230 Series Auger Packer 77 OF 115 ...
Page 78: ...230 Series Auger Packer 78 OF 115 ...
Page 79: ...230 Series Auger Packer 79 OF 115 ...
Page 80: ...230 Series Auger Packer 80 OF 115 ...
Page 81: ...230 Series Auger Packer 81 OF 115 ...
Page 82: ...230 Series Auger Packer 82 OF 115 ...
Page 83: ...230 Series Auger Packer 83 OF 115 ...
Page 84: ...230 Series Auger Packer 84 OF 115 ...
Page 85: ...230 Series Auger Packer 85 OF 115 ...
Page 86: ...230 Series Auger Packer 86 OF 115 ...
Page 87: ...230 Series Auger Packer 87 OF 115 ...
Page 88: ...230 Series Auger Packer 88 OF 115 ...
Page 89: ...230 Series Auger Packer 89 OF 115 ...
Page 90: ...230 Series Auger Packer 90 OF 115 ...
Page 91: ...230 Series Auger Packer 91 OF 115 ...
Page 92: ...230 Series Auger Packer 92 OF 115 ...
Page 93: ...230 Series Auger Packer 93 OF 115 ...
Page 94: ...230 Series Auger Packer 94 OF 115 ...
Page 95: ...230 Series Auger Packer 95 OF 115 ...
Page 96: ...230 Series Auger Packer 96 OF 115 ...
Page 97: ...230 Series Auger Packer 97 OF 115 ...
Page 98: ...230 Series Auger Packer 98 OF 115 ...
Page 99: ...230 Series Auger Packer 99 OF 115 ...
Page 100: ...230 Series Auger Packer 100 OF 115 ...
Page 101: ...230 Series Auger Packer 101 OF 115 ...
Page 102: ...230 Series Auger Packer 102 OF 115 ...
Page 103: ...230 Series Auger Packer 103 OF 115 ...
Page 104: ...230 Series Auger Packer 104 OF 115 ...
Page 105: ...230 Series Auger Packer 105 OF 115 ...
Page 106: ...230 Series Auger Packer 106 OF 115 ...
Page 107: ...230 Series Auger Packer 107 OF 115 ...
Page 108: ...230 Series Auger Packer 108 OF 115 ...
Page 109: ...230 Series Auger Packer 109 OF 115 SCHEMATICS DRAWINGS ...
Page 110: ...230 Series Auger Packer 110 OF 115 ...
Page 111: ...230 Series Auger Packer 111 OF 115 ...
Page 112: ...230 Series Auger Packer 112 OF 115 GENERAL ARRANGEMENT DRAWING ...
Page 113: ...230 Series Auger Packer 113 OF 115 ...