background image

Customer Service 

800.606.6252

  |  Latest instructions available at 

www.cb2.com

Made in Vietnam - r03

Page 1 of 6

shake 

TALL CHEST

Thank you for purchasing the 

Shake Tall Chest.

  This 

page lists all the contents included in the box.  Please take 

the time to identify the hardware as well as the individual 

components to this product.  As you unpack and prepare 

for assembly, place the contents on a carpeted or padded 

area to protect them from damage.

Note: 2 people are recommended to safely assemble this product.   

components

assembly hardware

mounting hardware

tools required

4 - plastic

anchors

4 - small

screws

4 - large

screws

4 - mounting

brackets

2 - wall

straps

Missing hardware?  Please call 

800.606.6387

 for replacements.

phillips head screwdriver

(We recommend the use of hand tools instead of power tools)

1 - top panel

1 - center panel

4 - drawer fronts

1 - back panel

1 - bottom panel

2 - side panels

(1 left, 1 right)

4 - drawer bottoms

12 - wood

dowels

12 - bolts

32 - screws

8 - drawer sides

(4 left, 4 right)

4 - drawer backs

Summary of Contents for SHAKE TALL CHEST

Page 1: ...ted or padded area to protect them from damage Note 2 people are recommended to safely assemble this product components assembly hardware mounting hardware tools required 4 plastic anchors 4 small screws 4 large screws 4 mounting brackets 2 wall straps Missing hardware Please call 800 606 6387 for replacements phillips head screwdriver We recommend the use of hand tools instead of power tools 1 to...

Page 2: ... 6252 Latest instructions available at www cb2 com bottom panel left and right side panels top panel With assistance of another adult fit dowels of left and right side panels into corresponding holes of center panel and attach with 4 bolts Secure but do not over tighten bolts with a phillips head screwdriver left side panel right side panel Note Do not over tighten the bolts center panel ...

Page 3: ...p panel into corresponding holes of assembly and attach with 4 bolts Fit dowels of bottom panel into corresponding holes of assembly and attach with 4 bolts 4 shake TALL CHEST Made in Vietnam r03 Page 3 of 6 Customer Service 800 606 6252 Latest instructions available at www cb2 com bottom panel back panel top panel ...

Page 4: ...h left drawer side to drawer front with 2 screws Secure but do not over tighten screws with a screwdriver Fit drawer bottom into corresponding grooves of drawer assembly shake TALL CHEST Made in Vietnam r03 Page 4 of 6 Customer Service 800 606 6252 Latest instructions available at www cb2 com drawer front left drawer side drawer bottom drawer back right drawer side ...

Page 5: ...am r03 Page 5 of 6 Customer Service 800 606 6252 Latest instructions available at www cb2 com drawer assembly cleaning and care Clean surfaces with a dry or damp soft cloth Do not use abrasive cleaners NOTE Make sure glides are pulled out of the case and ball bearings are at the front of the extended glides To prevent damage to glides keep drawer assembly level during installation ...

Page 6: ...the unit in desired location against the wall Mark the location of the hole in the bracket on the wall Move the unit out of the workspace C Drill holes slightly smaller in diameter than the anchors Insert 1 plastic anchor into each hole until they are flush to the wall D Insert 2 large screws through each bracket and plastic anchor Secure but do not over tighten with a phillips head screwdriver E ...

Reviews: