![Cavisynth SEQ-UFD Assembly Manual Download Page 2](http://html1.mh-extra.com/html/cavisynth/seq-ufd/seq-ufd_assembly-manual_2574974002.webp)
First, make sure you have in your possession all the necessary parts and components.
For this, refer to the boom file : http://cavisynth.com/product/seq-ufd/#downloads
You will also need:
•
A soldering iron
•
Welding wire
•
A fine forceps
•
The side cutter
•
Stripper's son
•
A dry and clear work plan
•
Between 3 and 4 hours for construction
In the phicture below, you can see every part before final assembly.
It consists of 3 boards (brain, trigger, CV) ProMini a board and a front panel.
So... let's go !!!
SEQ-UFD V1 - www.cavisynth.com – 2016 S.Caviglioli 2