EN-6
Operation
Start operation
1. Cleaning the compartment
Before power on, clean inside of the appliance and check the drainage pipe in good
connection.
(
For details, please refer to the “Maintenance and cleaning”
)
2. Put the appliance still
Before power on, level the appliance on the firm & dry floor for at least 30 minutes.
3. Power on
The appliance start operation and it will cool down inside after 1 hour, otherwise you
should check the power connection.
Control panel
All keys would be invalid in lock mode. Please unlock first.
ON/OFF
1. Keep pressing the key 3 seconds, power down, goes to stand-by mode.
2.Keep pressing the key again 3 seconds to return back to normal working.
Light
Press the key, turn on or turn off the LED lights inside. In stand-by mode, the key
is invalid.
Zone switch
Press the key to switch between upper zone and lower zone for choosing which
zone to set temperature. Press the key once, the LED display in chosen zone
flash regularly. Press up and down key to set temperature. Press the key again;
switch the zone to set temperature.
UP
Press the key once, LED Display in regular flash showing current set
temperature. Continue pressing to adjust set temperature, one press increases
1
℃
. Regular flash quit after 5 seconds detecting no press and new set
temperature save. LED display return to show actual temperature inside.