ENGLISH June 2021 IND B
Page
36
of
156
CATANA SAS - Zone Technique du Port - 66140 CANET EN ROUSSILLON (FRANCE)
e - mail : [email protected] - Tel 33 (0)4 68 80 13 13 - Fax 33 (0)4 68 80 13 19
6.7. Sugar-scoop shower
The shower on the aft steps comprises both a hot and a cold-water circuit. It is located on the port transom.
7. FLOODING
Risk of the vessel flooding:
-
Keep the hatches, windows, removable panels, doors, ventilation panels or openings closed when
it is appropriate, for example in severe weather conditions or sailing at high speeds.
-
Never drill or pierce any buoyancy tanks.
-
Ensure that hatches, deck hatch covers or any other openings which could lead to flooding are
closed before each time you put to sea.
-
When under sail, close all the valves with the exception of the engine seawater cooling intake.
Periodically check:
-
The watertightness of the through-hulls, seacock valves and pipework.
-
That the cockpit drains are clear.
-
The saildrive gasket joint must be replaced according to the engine manufact
urer’s schedule
.
WARNING
The hatch covers in the sugar scoops must be locked shut before every time you put to sea. This is
particularly important, as the engine compartments present a significant risk for flooding .