22 |
P a g e
cascadesciences.com
|
Tel. 503 847-9047
INSTALLATION
I
NSTALL THE
S
HELVING
Perform the following steps to install the shelving:
1.
Install 4 clips for each shelf in the slots located on the sides of the chamber interior.
a.
Squeeze each clip.
b.
Insert the top tabs first, then the bottom tabs using a rocking motion.
2.
Place the shelves on the clips.
A
CCESS
P
ORT
S
TOPPER
Verify the port stopper is installed in the access port on the back of the unit. The oven will not meet its
temperature performance specifications without the stopper installed.
The stopper must always be installed on the outside of the oven.
Installing the stopper on the inside
of the oven risks damaging the stopper.
The intended use of the port is to introduce sensor probes into the oven chamber.
Install Clips
Place the Shelf
Port Stopper in Access Port
Summary of Contents for CDO-5-2
Page 1: ...Installation Operation Manual CDO 5 2 Drying Decarboxylation Oven 220 240 Voltage...
Page 6: ...6 P a g e cascadesciences com Tel 503 847 9047 CERTIFICATIONS...
Page 10: ...10 P a g e cascadesciences com Tel 503 847 9047 SPECIFICATIONS...
Page 12: ...12 P a g e cascadesciences com Tel 503 847 9047 INTRODUCTION...
Page 44: ......