Pre-Installation Item Check List
Hardware
1) VFD controller received is as per rated Voltage and Phase
2) Motor & gear Box assembly received are as per rated voltage & Phase
3) VFD controller is placed within the desired distance from the Fan
4) Check for any damage or loss during transit.
5) Has the Installation site been decided?
Installation site Clearances
6) Ensure that fan blades are a minimum 10ft or more from floor level.
7) Ensure that any obstructions are at least 2ft away horizontally from
the fan blade tip.
8) Ensure that Fan is installed so that minimum clearance from ceiling
is as per Table -1
Parts List:
9) Packing list of Fan parts & Hardware
10) Mounting Extension Kit (If ordered)
11) Installation Tools Kit