![Carver GVS Series Installation, Operation And Maintenance Manual Download Page 10](http://html1.mh-extra.com/html/carver/gvs-series/gvs-series_installation-operation-and-maintenance-manual_2565147010.webp)
6
1. If pump is stopped for overhaul, slowly close
the discharge valve. Otherwise, leave
discharge valve set at condition.
2. Stop the pumping unit in accordance with the
directions on the electrical power supply.
3. If the pump is stopped for overhaul, close
pressure gauge valves.
4. The pumping unit is now in the off position.
Before disassembly/assembly, review Table A,
Torque Values to avoid equipment damage and injury
to personnel.
Table A. Recommended Torque Values (ft-lbs)
Bolt Size
Material
Steel (or otherwise
noted)
316 Stainless
Steel
¼”-20
5
7
5/16”-18
11
12
3/8”-16
18
21
½”-13
39
45
5/8”-11
83
97
¾”-10
105
132
7/8”-9
160
203
1”-8
236
300
VI. TROUBLESHOOTING.
The pump should provide reliable service and long life
if the installation and starting procedures outlines in
this manual are followed. If operating problems do
occur, refer to Table 1 to eliminate some of the most
common causes of those problems.
Summary of Contents for GVS Series
Page 1: ...GVS I 480 Rev 01...
Page 3: ...NOTES ON INSPECTION AND REPAIRS INSPECTION DATE REPAIR TIME REPAIRS COST REMARKS...
Page 23: ...19 Figure 2 Shaft Coupling Detail...
Page 24: ...20 Figure 3 Bearing Lube Options...
Page 25: ...21 Figure 4 Optional Wear Ring...
Page 26: ...22...
Page 27: ...October 2003...