
36
6. Remove igniter wires and sensor wires at the Integrated
Gas Unit Controller (IGC). See Fig. 48.
7. Remove the 2 screws that attach the burner rack to the ves-
tibule plate. See Fig. 46.
8. Slide the burner tray out of the unit. See Fig. 47.
9. To reinstall, reverse the procedure outlined above.
Fig. 46 — Burner Assembly Removal
Fig. 47 — Burner Tray Details
CLEANING AND ADJUSTMENT
1. Remove burner rack from unit as described in “Removal
and Replacement of Gas Train” above.
2. Inspect burners; if dirty, remove burners from rack. (Mark
each burner to identify its position before removing from
the rack.)
3. Use a soft brush to clean burners and cross-over port as
required.
4. Adjust spark gap. The gap should be 0.12-in. to 0.14-in.
(3.06 mm to 3.60 mm) and spaced 0.18-in. (4.60 mm)
from the end of the burner. See Fig. 50.
5. If factory orifice has been removed, check that each orifice
is tight at its threads into the manifold pipe and that orifice
projection does not exceed maximum valve. See Fig. 45.
6. Reinstall burners on the rack in the same locations as they
were installed at the factory. The outside crossover flame
regions of the outermost burners are pinched off to prevent
excessive gas flow from the side of the burner assembly. If
the pinched crossovers are installed between two burners,
the flame will not ignite properly.
7. Reinstall burner rack as described in “Removal and
Replacement of Gas Train.”
BURNER
A
SS
EMBLY
GA
S
VALVE
VE
S
TIBULE
PLATE
S
CREW
S
MANIFOLD
PRE
SS
URE TAP
~
4
3
2
1
1
Item No.
Description
1
Gas Manifold Mounting Screws (qty 2)
2
Gas Valve Inlet Plug
3
Propane Conversion Label
(apply label where indicated)
4
Gas Manifold Pressure Tap
Summary of Contents for WeatherMaster Puron 48HC D17
Page 18: ...18 COOLING CHARGING CHARTS Fig 22 Cooling Charging Chart 15 Ton ...
Page 19: ...19 Fig 23 Cooling Charging Chart 17 5 Ton ...
Page 20: ...20 Fig 24 Cooling Charging Chart 20 Ton ...
Page 21: ...21 Fig 25 Cooling Charging Chart 25 Ton ...
Page 37: ...37 Fig 48 Unit Control Box IGC Location IGC Board IGC Board Side view Front view ...
Page 40: ...40 Fig 51 Typical IGC Wiring Diagram ...
Page 46: ...46 Fig 57 RTU Open Overlay for Economizer Wiring ...
Page 47: ...47 Fig 58 VFD Overlay for W2770 Controller Wiring ...
Page 84: ...84 Fig B 48HC D17 D28 Control Diagram 208 230 3 60 460 575 3 60 ...
Page 85: ...85 Fig C 48HC D17 D28 Power Diagram 208 230 3 60 ...
Page 86: ...86 Fig D 48HC D17 D28 Power Diagram 460 3 60 ...
Page 87: ...87 Fig E 48HC D17 D28 Power Diagram 575 3 60 ...
Page 88: ...88 Fig F 48HC D17 D28 Control Diagram with Humidi MiZer System ...
Page 89: ...89 Fig G 48HC D17 D28 Power Diagram 208 230 3 60 with Humidi MiZer System ...
Page 90: ...90 Fig H 48HC D17 D28 Power Diagram 460 3 60 with Humidi MiZer System ...
Page 91: ...91 Fig I 48HC D17 D28 Power Diagram 575 3 60 with Humidi MiZer System ...
Page 92: ...92 Fig J PremierLink System Control Wiring Diagram 50HE500891 F ...
Page 93: ...93 Fig K PremierLink System Control Wiring Diagram with Humidi MiZer System ...
Page 94: ...94 Fig L RTU OPEN Wiring Diagram ...
Page 95: ...95 Fig M RTU OPEN Wiring Diagram with Humidi MiZer System ...
Page 97: ......