Document revision history
VVT Zone II Controller
CARRIER CORPORATION ©2019
Installation and Start-up Guide
All rights reserved
98
Important changes to this document are listed below. Minor changes such as typographical or formatting errors are not
listed.
Date
Topic
Change description
Code*
1/25/19
Wiring devices to the VVT Zone II's Rnet
port
Removed star configuration from the first paragraph.
X-TS-TS-O
Specifications
Added surge CAUTION to Protection specification.
X-TS-AK-E-CC
12/17/18 Wiring the VVT Zone II for power > To
wire the controller for power.
Added photograph of lifting up the cover.
X-H-RE-E-CC-JS
Mounting the VVT Zone II > To mount
the controller and actuator
Added caution stating that you must use the bushing, O-ring,
and screws that are shipped with the VVT Zone II, along with
applicable graphic.
X-H-RE-E-CC-JS
10/30/18 Wiring equipment to the VVT Zone II's
outputs > Wiring diagram legend
Removed SPT sensors. Now shown as "Space temp sensor" in
diagrams
C-D
Wiring sensors to the VVT Zone II's
inputs > To wire the T55 sensor to the
controller
Removed reference to SPT sensors.
C-D
Wiring sensors to the VVT Zone II's
inputs
Removed ZS, SPT, and wireless sensors because they are wired
to the Rnet port.
C-D
Sequence of operation > Temperature
sensors
Removed SPT sensors.
C-D
8/28/18
Wiring devices to the VVT Zone II's Rnet
port
Added TruVu™ ET Display.
Made one topic for overview and wiring for each device.
Removed SPT sensor detail.
C-D
Specifications
Reworded Rnet port specification and added power supplied by
Rnet port.
Added first paragraph to Protection specification.
X-H-JS-O
8/2/18
To wire the CO2 sensor to the
controller
Diagram for the #33ZCT55CO2 corrected to show wiring to J5 -
3 and 2, not 1 and 2.
C-TS-CP-E-WB
* For internal use only
Document revision history
Summary of Contents for VVT Zone
Page 103: ......