21
62-10327
Figure 25 Condenser Receiver
13. Inspect water fittings on the water-cooled condenser (if equipped)
for damage. Pressurize connections and record value of water
pressure switch cut-out and cut-in. Check the
for the correct switch cut-in and cut-out pressures. Locating
operation & service manuals is explained in the
section.
14. Download (interrogate) the unit DataCORDER, Example: Using
DataBANK downloading card (Refer to
). The download
should be performed from the “Last Trip Start” to ensure all PM
temperature and PTI data are obtained. Consult the interrogation
manual for proper downloading procedures.
Figure 26 DataBANK Downloading Card
15. Turn the unit off and disconnect from power supply.
16. Print out the trip report and retain it as a permanent record of
the PM.
Refrigerant level will
be within range if the
bottom sight glass is
full and the top sight
glass is empty
Moisture indicator
Example: Using DataBANK downloading card
Summary of Contents for PrimeLINE 69NT40-561
Page 2: ......
Page 4: ......
Page 8: ...62 10327 4 Figure 3 Evaporator Coil Figure 4 Evaporator Fan Blade...
Page 11: ...7 62 10327 Figure 9 ETS1 and ETS2 Figure 7 TXV Figure 8 EEV...
Page 26: ......
Page 28: ......
Page 29: ......