Installing the Zone Ctrl II
Zone Ctrl II and
VAV Zone II Secondary Duct Installation and Start-up Guide
CARRIER CORPORATION ©2019
Error! No text of specified style in document.
6
All rights reserved
1
Mount the controller
(page 6).
2
Wire the controller for power
(page 10).
3
Set the controller's address
(page 12).
4
Wire the controller to the BACnet MS/TP or BACnet ARC156 network
(page 15).
5
Wire inputs and outputs.
(page 16)
6
Wire devices to the controller's Rnet port
(page 19).
For details on installing a secondary terminal, see
Using a VAV Zone II Secondary Duct for a dual duct system
(page 25).
To mount the Zone Ctrl II
To disconnect and mount the controller and actuator separately
Installing the Zone Ctrl II