background image

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

PC 111

Catalog No. 534-754

Printed in U.S.A.

Form 48GS,GX-3SI

Pg 2

7-99

Replaces: 48GS-2SI

Book 1 4
Tab

1a 6a

Copyright 1999 Carrier Corporation

INSTALLATION

1. Turn off gas supply, then main power supply to unit.
2. Remove access panel for compressor and control box.

See Fig. 1.

3. Spread crankcase heater arms and slide crankcase

heater over the top of the compressor. See Fig. 1.

4. Wrap heater around compressor base approximately

2 in. above compressor mounting plate.

5. Fasten heater firmly in place with fastening clip

(Fig. 1) provided with the crankcase heater.

6. Route crankcase heater leads into unit control box, fol-

lowing the path of the compressor leads. See Fig. 1.

7. Connect one black lead to the compressor contactor

terminal 11, and connect other black lead to compres-
sor contactor terminal 13 for 3-phase units; 23 (line
side) for single-phase units. See Fig. 2.

8. Attach green crankcase heater ground lead to ground

screw in control box. 

9. Replace access panel.

10. Turn on main power supply, then gas supply.

C

CH

C

BLK

BLK

11

13*

CONTROL BOX

CRANKCASE
HEATER

COMPRESSOR

INDOOR FAN MOTOR

ROUTE WIRES
AS SHOWN

Fig. 1 — Typical Crankcase Heater Installation

LEGEND

*For 3-phase units only. For single-phase units, connect black lead

to terminal 23 (line side)

Fig. 2 — Crankcase Heater Wiring

C

— Compressor Contactor

CH

— Crankcase Heater

    

Marked Terminal

TOP CONDENSER SECTION NOT SHOWN

Reviews: