8. Inspect all electrical connections. Be sure connections are
clean and tight at the terminals.
9. Check unit controls. If Complete C, or Deluxe D, verify field
provided thermostat or DDC control is available. If WSHP
Open, verify proper sensor has been provided and a commis
-
sioning interface will be available.
10. 50HQP Only - Locate the hanging bracket kit located in the
compressor compartment.
11. 50HQP Only - For units with the SAV
TM
or single speed
VFD option, locate the VFD (ships in control box section or
on the pallet with the unit). See Fig. 1 for VFD shipping box
location. If VFD is not found, contact your Carrier sales
representative.
Fig. 1 —
Field Installed VFD Shipping Location, 50HQP Units
AIR COIL
COMPRESSORS
ELECTRICAL
CONTROL
BOX
VFD
BOX
BLOWER
BLOWER
BLOWER
MOTOR
BLOWER
MOTOR
Summary of Contents for Aquazone 50HQP 072
Page 23: ...23 Fig 20 Single Phase with WSHP Open ...
Page 26: ...26 Fig 23 3 Phase with WSHP Open ...
Page 28: ...28 Fig 25 3 Phase Deluxe D Control Package with 1 Speed VFD and Hot Gas Reheat ...
Page 29: ...29 Fig 26 3 Phase with WSHP Open Hot Gas Reheat Water Economizer and SAVTM ...
Page 31: ...31 Fig 28 WSHP Open W2A Wiring Diagram ...